Civic Issues
Topics getting the most attention in Bartholomew County public meetings, ranked by how frequently they are discussed.
45 issues with high priority
Heflen Park septic system project
The new lift station pumps Heflin Park campground wastewater to Driftwood Utilities instead of an aging leach field, keeping all camp sites in service and even allowing the park to expand. The county gets about $6,200 back from unused contingency.
Highway department progress and overlay
The district needs a new trackloader but the only compliant bid came in at $471,148.56 — about $54,000 over the $417,000 budgeted. The board held off on a decision until May to review the bid.
Jail and courts funding shortfalls
Superior Court II will seek $3,000 from the state to help pay for certified interpreters needed at language hearings at least twice a month.
Chicken Creek drain assessment dispute and lawsuit settlement
Property owners have sued to challenge what the board approved in December. It's treated as routine litigation, but the county may need outside counsel and possibly an executive session.
Opioid settlement funds distribution
The RAP and REAM programs give non-violent offenders six months of residential treatment in work release plus six months of aftercare, with a roughly 60% graduation rate and lower recidivism. The grant extension keeps them funded through March 2027.
Sentry Biopharma expansion and tax abatement
Sentry Biopharma wants to spend about $11.5 million expanding its pharmaceutical cold-storage facility near Edinburgh, adding 23 jobs averaging over $64,000. Commissioners certified the benefits statement; the county council will decide the actual tax abatement.
BMX track expansion at Dunn Stadium
The BMX track opens April 11 after rain delays. A state-installed culvert set too high years ago is backing up drainage; fixing it is the gate to a hoped-for track expansion with new berms.
Petersville park activity concerns
Board members found dozens of discarded needles near the Petersville shelter house and asked the sheriff's department to add routine patrols. Camera deterrents were discussed, though commissioners have resisted cameras at parks.
Data center zoning rules
Residents, led by Brittany Good, are asking the county to ban hyperscale AI data centers, citing worries about rising utility bills, water use, and the shared aquifer with Shelby County. Commissioners say the county is instead moving to make data centers a conditional use in its few industrial zones, with a Plan Commission hearing expected in September.
Community Crossings grant shrinkage
After being shut out of state Community Crossings money (over the wheel tax), the county got a call that $843,500 was found for local roads. Phase one covers about 19.32 miles, with a possible phase two using the $1.5 million the council provided as a backup.
Final ARP report filed
The county still has $4 million in federal broadband money that must be spent by the end of 2026 or it goes back to Washington. The original vendor went bankrupt; a new vendor is working, and residents are asking when they'll get fiber.
Mowing contractor failure and funding transfer
The county picked a new Indianapolis company to mow roadsides for three years, saving about $130,000 versus the local incumbent's bid. The new firm will have to prove itself, and the county holds a 30-day out clause.
Early hiring of two sheriff's deputies
For the first time in memory, both the sheriff's office and jail are fully staffed, thanks in part to the expanded hiring pipeline. The sheriff warns jail turnover from young staff taking parental leave may require a bigger applicant pool.
Local income tax (LIT) distribution changes
The state is sending the county an unexpected $3.82 million true-up distribution from local income taxes. The county council will decide whether to return some to taxpayers or use it for needs like the jail and E911.
Final ARP reallocation — water/sewer and ambulance service
The county still has $4 million in pandemic relief money reserved for broadband, and only about half the county has gotten high-speed internet so far. The money must be spent by year's end, and the county is asking Congressman Shreve's office about an extension.
Jail rooftop HVAC failure and replacement
The courthouse cooling tower, in service for decades, had built up impurities that were clogging building units. A $5,188 full system flush by Circle R Mechanical was ratified.
2027 Budget Planning and 6% Growth Quotient
The board chose which improvement projects make the 2027 budget: a lighted flagpole at Dunaway, foul-ball netting, ADA campsites, and batting cages. Members debated asking for more money versus living within a roughly 2% increase.
Humane Society Funding Restructure
The county's animal control costs have jumped from $90,000 five years ago to roughly $250,000 budgeted this year, driven partly by abandoned animals. The new five-year contract locks in a flat $100,000 base fee, and commissioners are banking on a new low-cost spay/neuter program to bring numbers down.
DC Elliott Drain Phase Two reconstruction
Phase 1 was done six to eight years ago; Phase 2 is estimated around $50,000 and is the only remaining reconstruction the drain fund can afford. It's now at the top of the list with plans and bidding targeted for this fall.
Property fraud rising in Bartholomew County
The Recorder's office renewed its five-year redaction service that automatically blacks out Social Security numbers on recorded documents like death certificates and transfer-on-death affidavits. Staff manually review every document through at least four sets of eyes.
Covered Bridge Maintenance Funding
Commissioners praised the highway engineer's long-range bridge planning and discussed whether the Cumulative Bridge tax rate should be raised — commissioners would initiate it and council would have to approve. The county has the lowest rate around except Brown County, and the Flat Rock River bridge remains closed.
BCSC operating referendum renewal on November ballot
The school district is asking voters this fall to renew the 2020 operating referendum that pays for teacher retention, school safety staff and elementary STEM teachers — about $9.5 million a year. The rate stays at 15.6 cents but a new $10.1 million levy cap means most taxpayers would pay slightly less. Officials say losing it would hurt teacher retention and student outcomes.
Youth Services Center $16.5 million maximum budget
The Youth Family Community Connections Center project has grown to a preliminary $16.5 million plus $2.1 million contingency — up from the $14 million the council set aside. Members agreed to keep moving while hunting for savings, with a formal vote in June.
New countywide 911 radio system
Motorola is sunsetting the county's core 911 radio system in 2030 and offered a deal to replace it now for about $659,000 — saving an estimated $300,000 or more. The county's share is roughly $270,000, split 45/55 with the city, with a formal vote expected June 8.
2026 General Election voting locations and hours
Early voting moves to two Saturdays at the governmental office building, plus courthouse hours on election day for vote counting. Early voting at Gather Columbus is reportedly drawing strong turnout and good parking.
Sheriff fleet replacement
The sheriff's office gets five new Silverados, upfits for six vehicles, and a $290,000 federal grant request for drug ID machines and traffic enforcement vehicles. The DEA forfeiture fund holds $278,553 for equipment and training.
Blair Thompson addition detention drainage
Residents around the Blair Thompson Addition have dealt with standing water in a low-spot detention area for years — some recall water waist-deep and kids playing in it. A proposed 12-inch tile drain would lower the water level to within about a foot of emptying it, with costs to be assessed to benefited property owners at a later hearing.
Anderson Falls restroom grant deferred to 2028
Chuck Wells is pushing to replace the primitive pit toilets at Anderson Falls with a proper modern restroom, asking for cost estimates now rather than waiting for the master plan.
Broken Gator at Heflen Park
The utility vehicle camp hosts depend on for daily operations died mid-season, and the board wanted it looked at by a real mechanic rather than patched in-house. Commissioners have now approved trading it in on a new one.
Speeding and missing one-way sign at Heflen Park
Speeding keeps being a problem in the campground, and the one-way sign that came down early last season still hasn't been rehung — the board made it a priority for Rich.
Lowell Bridge replacement and roundabout project
The Bridge No. 170 replacement over the Driftwood River and a new roundabout at Lowell Road and 325 West are moving forward, with construction inspection now under contract. Bidding happens in January, so construction is still a ways off.
Meridiam broadband abatement revocation
MStreet Fiber's countywide rural internet project is frozen at about 20% a year after its contractor went out of business, leaving most rural residents without the fiber service they were promised. The county's $4 million ARPA payment never triggered, and Commissioner London wants the council to review the company's tax abatement.
Goldie Ann mobile home park sinkholes
The park's owner faces sinkholes and a threatened holding tank from a failing private clay tile the county says isn't a county drain — leaving him to fix it with the upstream landowner or risk backing water onto neighbors.
Walesboro Drain flooding and erosion
A homeowner on Jonesville Road has watched flooding worsen since industrial facilities and Southern Crossing went in, with her yard washing away and water backing up whenever the White River rises. The board says it can only stabilize the banks — it can't control river backwater or upstream volume.
ADA accessibility in county parks
The new master plan flagged parking lots, signage and campsites county-wide as ADA trouble spots. Two accessible campsites at Heflin Park are a must-do this fall, funded from this year's budget.
911 Center Backup Power Replacement
The 911 center's 12-year-old battery backup finally died; the council approved $51,137 to replace it, with Columbus picking up 55% of the cost. It keeps dispatch systems alive when power flickers or the generator kicks in.
Gas-tax holiday draining road funds
The state's suspension of the gas tax is costing the highway fund roughly a quarter-million dollars a month, threatening the paving program. Council members discussed forecasting options and possibly scaling back the extra paving appropriation if revenues keep falling.
Jail washing machine replacement
All three industrial washers at the jail — installed 18 years ago and running six days a week — failed at once, forcing an emergency $61,150 replacement including craning equipment through the basement.
Parks Master Plan and Funding Strategy
The draft plan says residents overwhelmingly want existing parks fixed up first — 91% support infrastructure improvements, 88% restrooms, 79% playgrounds. It also flags chronic underfunding: about $8 per resident versus a $33 national median, with just two full-time staff for 13 parks and 160 acres.
Dunn Stadium turf replacement costs
Staff built their own temporary outfield fences from PVC, saving about $6,000 per field. A full infield turf project is estimated at about $1 million installed, and irrigation review comes in April — items headed for budget season.
Proposed Flat Rock River Watershed Development Commission
A new five-county watershed commission could levy a special assessment (about $7 max per residential parcel) and raise roughly $1 million a year, with most flood-control needs upstream in Henry and Rush counties. Both commissioners said Bartholomew County would pay a disproportionate share, get minority representation, and see little benefit — so they're out.
Animal Ordinance Fines Increase
The county wants to stop picking up feral cats, treat them as wildlife, and strip TNR language from the 2021 ordinance — largely to cut rising Humane Society per-animal costs. Humane Society staff, volunteers, and residents pushed back hard on overpopulation, disease, and abandonment concerns, and the commissioners tabled the vote and promised to restore TNR language.
2026 Road Paving Funding
The county awarded the yearly road resurfacing contract to Milestone at $1,845,702.50, with nearly $850,000 in state Community Crossings funds helping pay for it. Overlay costs have climbed from about $50,000 to $96,000 per mile in five years, and the county plans a second bid round later.
Cook & Lehman tile reconstruction — cost and possible abandonment
A seven-mile, century-old 8-inch tile can't handle modern farm drainage, and fixing it could cost around $750,000 — money the drain fund doesn't have. Area landowners hired an attorney to fight the project in 2013, and the board is now weighing whether to abandon the drain instead. Decision deferred to next month's full board.
EDIT capital improvement plan
The county's two-year plan for economic development income tax money locks in about $5 million of priorities, including $1.3 million for the Northern Gateway commercial corridor and $500,000 toward road overlays to make up for shrinking state road money.