Heflen Park septic system project
Summary
The new lift station pumps Heflin Park campground wastewater to Driftwood Utilities instead of an aging leach field, keeping all camp sites in service and even allowing the park to expand. The county gets about $6,200 back from unused contingency.
At a glance
- Total mentions
- 12
- Last 30 days
- 2
Rising — discussed at 4 meetings since Oct 1, 2026, up from 0 in the two months before.
Impact analysis
Final contract total of $275,153.70, with $6,258.37 returned to the county from unused contingency.
Campers, park visitors, and Driftwood Utilities customers get a reliable sewer system and the park can grow.
Campers may briefly lose dump station access during the tie-in work.
Mentions & discussions (12)
Commissioners — November 16, 2026
The new lift station pumps Heflin Park campground wastewater to Driftwood Utilities instead of an aging leach field, keeping all camp sites in service and even allowing the park to expand. The county gets about $6,200 back from unused contingency.
Park Board — November 5, 2026
The septic-to-pump-system project at Heflen Park is done — the state passed the pump permit. It cost around $290,000 but lets the park run all its campsites and even expand in the future.
Commissioners — October 5, 2026
Construction on the Heflin Park force main and lift station ran into field conditions that didn't match the design, forcing relocated sewer laterals and a new plug valve. Most of the project's $30,000 contingency is now spoken for.
Park Board — October 1, 2026
Septic construction is tearing up roads and grounds at Heflin Park campground (to be restored after completion), and failed breakers knocked out power to campsites 1-14. A 200-amp panel installation begins October 6.
Park Board — July 9, 2026
The long-awaited septic project finally has a start date — contractor mobilization July 16 — and the directional bore won't block use of the land above it.
Commissioners — June 1, 2026
The county signed a $281,412 contract with Reed and Sons Construction to build the sanitary force main and lift station serving the Heflen Park area.
Commissioners — May 18, 2026
The county awarded the sewer force main and lift station project at Heflen Park to Reed & Sons Construction for $281,412.07, under the engineer's estimate. Work includes polymer coating to protect the connection manhole.
Commissioners — May 11, 2026
Six contractors bid to build sewer force main and lift service at Heflen Park, funded from the parks budget. The lowest base bid came in at $278,482 from Reed and Sons Construction.
Park Board — May 7, 2026
A well-attended bid meeting drew strong contractor interest; bids are due May 11 and a new DLZ design engineer has taken over without expected disruption. An electrical panel upgrade and 50-amp campsite service are part of the picture.
Commissioners — April 20, 2026
The park's 1970s-era septic system was deemed inadequate by the state for its number of campsites. The fix: a grinder pump station and force main hooking into Driftwood Utilities. Bids open May 11.
Park Board — March 5, 2026
After years of septic capacity problems, Heflin Park will connect to the Driftwood water and sewer system. Bidding is being scheduled, with brief interruptions to the dump station expected but minimal disruption to park operations.
Park Board — February 5, 2026
The park is moving forward with connecting to septic per the county commissioners, with the contractor working to bring the cost down ahead of an on-site meeting.
We'll email you when it's on an upcoming agenda and when it's voted on, at most once a day.
The weekly brief for Bartholomew County
What the council decided, in plain English — one email a week.
Free. Unsubscribe with one click any time. We never sell your email.