Top issues during term (20)(Roads)
Sheek Road truck signage
Minimal direct cost — this is a traffic regulation change with enforcement borne by the police department.
Main Street Segments 3 & 4 Right-of-Way Settlements
Total project cost not yet known; bids open June 25, 2026.
Whiteland/Honey Creek intersection improvements and future roundabout
The design contract is $459,000 in local funds, with construction costs still to come.
Averitt Road sidewalk gaps
No direct cost to the city — this is Duke Energy's own grid-upgrade project with police presence during closures.
Smith Valley Road Segment 3 federal funding
Adds $24,102 to the roundabout contract, though the total is still expected to come in under budget.
Main Street eastbound lane closure for water main replacement
The water company reimburses the city for the full cost of the water main work.
Main Street Segments 3 & 4 right-of-way acquisition
$15,200 amendment on top of the existing design contract.
Griffith Road Closure and Reconstruction
Lennar pays a $500/day penalty for every day past the 35-day window.
2026 Paving Project Expansion – Grassy Creek Lane
Contract value not yet known — bids go out mid-February.
Westwood Trail land acquisition
Not stated, though right-of-way purchases and construction are the next costs on the horizon for Westwood Trail.
Smith Valley Road/Woodmen Boulevard Roundabout Completion
The project ended about $65,700 cheaper than contracted.
Bridge-over-nothing dispute: Alexander Ditch crossing commitment
A potential $500,000 to $1 million infrastructure obligation on the developer, with long-term maintenance responsibility shifting to the city once dedicated.
Worthsville Road Railroad Crossing Delayed
Unknown future cost; a later fix may require a costly railroad permitting process.
Railroad Crossing Roadwork Contract Dispute
Unknown until Howard Companies quotes the work; railroad inspection requirements could raise costs.
2026-1 CCMG Partial Road Reconstruction
$1 million in INDOT funds cover half the cost, easing the hit to the city's road budget.
Cherry Tree Walk trail connection surveying
Design-stage work only; construction cost not yet before the board.
$1.86 million annual paving program
Contract of $1,857,935.00, roughly $265,327 under the engineer's estimate, funded by street funds, Eastside TIF and the Parks Department.
Cut-through traffic in Meadows at Bainbridge Villas neighborhood
Speed limit signs and speed-alert deployment come from existing street and police budgets; the traffic study adds work to an understaffed engineering division.
Main Street Segments 1 & 2 corridor improvements
The city is on the hook for about $37,046 in service-relocation costs to keep the project moving.
2026 Hot Mix Asphalt Material Bid
Unit prices ranging from $58.00 to $155.00 per ton, the lowest of three bidders.
Decisions during term (1)
Recorded while Williams was in office — not necessarily decisions they moved, spoke to, or voted on.
Voting record (0)(Roads)
No votes found matching Roads.