Northside Regional Lift Station Expansion
GroundBreakers will dig about 35 test holes along busy Yeager Road over ten working days to map underground utilities for the city's North Sewer Regional Lift Station project — key infrastructure supporting growth on the city's north side.
Delhart Street Weir CSO Overflow Study
Twenty-three years of work has cut sewer overflows into the Wabash from 25.5 million gallons in one 1993 month to 91,000 gallons in all of 2025. A new LEED-certified lab building and wet weather basin are wrapping up, and upcoming treatment upgrades should largely avoid ratepayer bonding impacts.
Sewer work homeowner reimbursement
When the city abandoned an old sewer main along Cumberland Avenue and Soldiers Home Road, a homeowner's patio had to be torn out. The board approved paying $11,750 to replace it.
Wastewater System Development Charge
New sewer connections will pay $2,500 to $400,000 depending on meter size, replacing the old flat $400 tap fee, with money going to infrastructure. Builders say they understand the need after staff meetings but worry about housing costs; the Indiana Apartment Association opposes it.
Soldiers Home Road fire hydrant relocation
Water main work on Soldiers Home Road forced Indiana-American Water to move its line to the east side, but an apartment complex needs a hydrant on the west side. The city will pay to keep a private hydrant there.
Provenance Phase 6 Water Main
Old Town Construction is installing a new water main for the Provenance Phase 6 development, closing Pathfinder Drive to through traffic for a week while keeping local access open.
Happy Hollow Park Utility Undergrounding
To keep a grant the city won two years ago, overhead power and fiber lines in Happy Hollow Park must go underground. Duke Energy and Wintek will do the work for up to $85,625.40.
Arbor Chase spillway project change order
The city is paying another $15,150 to fix the drainage channel between University Farm and Arbor Chase after earlier concrete work didn't meet standards.
SK hynix Wastewater Service Agreement
The chip plant will become the city's first industrial wastewater customer. The agreement spells out pretreatment requirements, state permits, monitoring, and a financial guaranty so bondholders are protected even if the plant doesn't open.
Sewer Rate Increases and $85 Million Wastewater Expansion
Sewer bills rise 2% a year for four years, and the city is bonding up to ~$85 million — financed partly at a low 2.87% state rate — to expand the wastewater plant's capacity from 10.5 to 15 million gallons a day. The bonds don't add new rate increases thanks to SK hynix grant funds and growth.
Wastewater utility finances and future rate increase
The 2025 utility report shows solid finances and a likely request later this year for another 2% inflationary increase — under $1 a month for the average customer. Sanitation fees are running short, prompting a review of routing and billing alternatives. The average residential bill is about $48 a month.
Wastewater Treatment Plant Modernization and Expansion
The city is borrowing up to $95 million to expand the wastewater treatment plant so it can handle more flow as the community grows. The debt will be paid from existing sewer revenues — no rate hike needed for this financing. The City Council has the final say on the bond ordinance.
Sewer lining near Soldiers Home Road
The city is lining a 24-inch sewer through a nature preserve before it collapses, avoiding a far more destructive open-cut repair.
Utility laboratory excellence award
The city's wastewater utility will be recognized again at the state convention for laboratory excellence and safety, with audit scores well above the minimums.
Chauncey Avenue sewer separation
A $74,600 survey is the first step to separate the last combined storm/sanitary sewer section on Chauncey Avenue, reducing sewage overflows into the Wabash and avoiding digging twice during the South Street Plaza project.
Wastewater utility plant expansion progress
Design drawings are nearly finished and submitted to the state for permits, with a bond ordinance headed to Council soon. Director Henderson also touted the union jobs the project is creating and urged young people to consider the trades.
Utility office building construction and EPA lab testing
Utilities Director Dave Henderson reported foundation work starting on the utility's office building and a delay in the annual EPA DMR-QA lab proficiency test, assuring quality checks continue.
Water Main Easement at University Place
The University Place assisted living expansion sits on top of an existing water main, so the main — and its easement — is being relocated. The park loses no usable land; the easement just gives the water company access if repairs are ever needed.
Duke Energy electrical capacity upgrade on Wood Street
Duke Energy will intermittently close Wood Street between Grant and South Chauncey from July 7 through August 11 while replacing utility poles and overhead wiring to boost electrical capacity. Drivers in the Chauncey Village area should expect lane and full closures during that stretch.
Wastewater plant electrical breaker repair
The main breaker that distributes all incoming power at the wastewater plant is faulty, so the city is renting a replacement while the original goes to Eaton for refurbishment — keeping the plant running without interruption.
City IT resilience and data center relocation
The city's server room — currently cramped in a basement closet — moves into a purpose-built space in the Public Safety Center, with off-site backup at the Wintek data center and cloud failover to keep city government running through disasters or ransomware.
Northwestern Heights Sewer Lateral Repairs
Seven sanitary laterals run through a 24-inch storm line in Northwestern Heights, and the clay-to-ductile connections are leaking into the storm sewer. Cured-in-place lining contractors will be sought to fix it quickly.
Curbside Reset Outreach
Street crews are ahead of schedule door-hanging neighborhoods about the upcoming changes to trash, recycling and yard waste pickup schedules.
Wastewater billing shift to landlords
Attorney and landlord John Burgett objected to a plan to bill wastewater to property owners, arguing landlords can't raise already-signed leases to cover it and many will be unhappy.