Civic Issues

Topics getting the most attention in West Lafayette public meetings, ranked by how frequently they are discussed.

Filtered to Water Utilities

24 issues in water utilities

HighWater Utilities

Northside Regional Lift Station Expansion

GroundBreakers will dig about 35 test holes along busy Yeager Road over ten working days to map underground utilities for the city's North Sewer Regional Lift Station project — key infrastructure supporting growth on the city's north side.

7 mentions (1 this month)Last discussed Nov 17, 2026
MediumWater Utilities

Delhart Street Weir CSO Overflow Study

Twenty-three years of work has cut sewer overflows into the Wabash from 25.5 million gallons in one 1993 month to 91,000 gallons in all of 2025. A new LEED-certified lab building and wet weather basin are wrapping up, and upcoming treatment upgrades should largely avoid ratepayer bonding impacts.

2 mentions (1 this month)Last discussed Nov 10, 2026
LowWater Utilities

Sewer work homeowner reimbursement

When the city abandoned an old sewer main along Cumberland Avenue and Soldiers Home Road, a homeowner's patio had to be torn out. The board approved paying $11,750 to replace it.

Last discussed Nov 3, 2026
HighWater Utilities

Wastewater System Development Charge

New sewer connections will pay $2,500 to $400,000 depending on meter size, replacing the old flat $400 tap fee, with money going to infrastructure. Builders say they understand the need after staff meetings but worry about housing costs; the Indiana Apartment Association opposes it.

13 mentions (1 this month)Last discussed Nov 2, 2026
MediumWater Utilities

Soldiers Home Road fire hydrant relocation

Water main work on Soldiers Home Road forced Indiana-American Water to move its line to the east side, but an apartment complex needs a hydrant on the west side. The city will pay to keep a private hydrant there.

1 mention (1 this month)Last discussed Oct 27, 2026
LowWater Utilities

Provenance Phase 6 Water Main

Old Town Construction is installing a new water main for the Provenance Phase 6 development, closing Pathfinder Drive to through traffic for a week while keeping local access open.

1 mention (1 this month)Last discussed Oct 20, 2026
MediumWater Utilities

Happy Hollow Park Utility Undergrounding

To keep a grant the city won two years ago, overhead power and fiber lines in Happy Hollow Park must go underground. Duke Energy and Wintek will do the work for up to $85,625.40.

1 mention (1 this month)Last discussed Oct 20, 2026
MediumWater Utilities

Arbor Chase spillway project change order

The city is paying another $15,150 to fix the drainage channel between University Farm and Arbor Chase after earlier concrete work didn't meet standards.

2 mentionsLast discussed Oct 6, 2026
CriticalWater Utilities

SK hynix Wastewater Service Agreement

The chip plant will become the city's first industrial wastewater customer. The agreement spells out pretreatment requirements, state permits, monitoring, and a financial guaranty so bondholders are protected even if the plant doesn't open.

1 mentionLast discussed Oct 6, 2026
HighWater Utilities

Sewer Rate Increases and $85 Million Wastewater Expansion

Sewer bills rise 2% a year for four years, and the city is bonding up to ~$85 million — financed partly at a low 2.87% state rate — to expand the wastewater plant's capacity from 10.5 to 15 million gallons a day. The bonds don't add new rate increases thanks to SK hynix grant funds and growth.

6 mentionsLast discussed Oct 5, 2026
HighWater Utilities

Wastewater utility finances and future rate increase

The 2025 utility report shows solid finances and a likely request later this year for another 2% inflationary increase — under $1 a month for the average customer. Sanitation fees are running short, prompting a review of routing and billing alternatives. The average residential bill is about $48 a month.

2 mentionsLast discussed Sep 29, 2026
HighWater Utilities

Wastewater Treatment Plant Modernization and Expansion

The city is borrowing up to $95 million to expand the wastewater treatment plant so it can handle more flow as the community grows. The debt will be paid from existing sewer revenues — no rate hike needed for this financing. The City Council has the final say on the bond ordinance.

3 mentionsLast discussed Sep 29, 2026
HighWater Utilities

Sewer lining near Soldiers Home Road

The city is lining a 24-inch sewer through a nature preserve before it collapses, avoiding a far more destructive open-cut repair.

2 mentionsLast discussed Sep 15, 2026
LowWater Utilities

Utility laboratory excellence award

The city's wastewater utility will be recognized again at the state convention for laboratory excellence and safety, with audit scores well above the minimums.

1 mentionLast discussed Aug 25, 2026
MediumWater Utilities

Chauncey Avenue sewer separation

A $74,600 survey is the first step to separate the last combined storm/sanitary sewer section on Chauncey Avenue, reducing sewage overflows into the Wabash and avoiding digging twice during the South Street Plaza project.

2 mentionsLast discussed Aug 19, 2026
HighWater Utilities

Wastewater utility plant expansion progress

Design drawings are nearly finished and submitted to the state for permits, with a bond ordinance headed to Council soon. Director Henderson also touted the union jobs the project is creating and urged young people to consider the trades.

1 mentionLast discussed Aug 11, 2026
LowWater Utilities

Utility office building construction and EPA lab testing

Utilities Director Dave Henderson reported foundation work starting on the utility's office building and a delay in the annual EPA DMR-QA lab proficiency test, assuring quality checks continue.

1 mentionLast discussed Jul 28, 2026
MediumWater Utilities

Water Main Easement at University Place

The University Place assisted living expansion sits on top of an existing water main, so the main — and its easement — is being relocated. The park loses no usable land; the easement just gives the water company access if repairs are ever needed.

3 mentionsLast discussed Jul 23, 2026
MediumWater Utilities

Duke Energy electrical capacity upgrade on Wood Street

Duke Energy will intermittently close Wood Street between Grant and South Chauncey from July 7 through August 11 while replacing utility poles and overhead wiring to boost electrical capacity. Drivers in the Chauncey Village area should expect lane and full closures during that stretch.

1 mentionLast discussed Jul 7, 2026
HighWater Utilities

Wastewater plant electrical breaker repair

The main breaker that distributes all incoming power at the wastewater plant is faulty, so the city is renting a replacement while the original goes to Eaton for refurbishment — keeping the plant running without interruption.

1 mentionLast discussed Jun 23, 2026
MediumWater Utilities

City IT resilience and data center relocation

The city's server room — currently cramped in a basement closet — moves into a purpose-built space in the Public Safety Center, with off-site backup at the Wintek data center and cloud failover to keep city government running through disasters or ransomware.

1 mentionLast discussed Jun 17, 2026
HighWater Utilities

Northwestern Heights Sewer Lateral Repairs

Seven sanitary laterals run through a 24-inch storm line in Northwestern Heights, and the clay-to-ductile connections are leaking into the storm sewer. Cured-in-place lining contractors will be sought to fix it quickly.

1 mentionLast discussed May 26, 2026
MediumWater Utilities

Curbside Reset Outreach

Street crews are ahead of schedule door-hanging neighborhoods about the upcoming changes to trash, recycling and yard waste pickup schedules.

1 mentionLast discussed May 19, 2026
MediumWater Utilities

Wastewater billing shift to landlords

Attorney and landlord John Burgett objected to a plan to bill wastewater to property owners, arguing landlords can't raise already-signed leases to cover it and many will be unhappy.

2 mentionsLast discussed Apr 6, 2026