McCarty Lane Traffic Study
The Commission will consider a traffic study for McCarty Lane prepared by Shrewsberry & Associates, LLC.
Lafayette Theater digital marquee screens
The Commission will consider a Guaranteed Maximum Price Change Order #2 for the Lafayette Theater by Kettelhut Construction, Inc.
Hope Lane Improvement Project
The Commission will consider a notice of recommendation/selection for a build-operate-transfer procurement for the Hope Lane improvement project.
Downtown Streetscape Final Phases
The Commission will consider a notice of recommendation/selection for a build-operate-transfer procurement for downtown Lafayette streetscapes.
2027 Utility Emergency Repairs Bidding
The city wants to line up contractors on call for emergency water and utility repairs throughout 2027, so broken mains and lines get fixed fast.
Sanitation Holiday Schedule Change
Sanitation crews will now observe all city holidays instead of collecting trash on them, with routes combined or doubled on other days. A one-time 2027 Christmas-week conflict gives affected workers a floating holiday instead of premium pay.
Old Landfill Cleanup at Canal Road
The city is spending an extra $15,500 with Wessler Engineering to plan cleanup of old trash, tires, and car parts people dumped into a ravine off Canal Road. The original landfill delineation work is done, and IDEM flagged concerns in 2026.
Rear setback and parking relief at 2300 South St
A property owner at 2300 South Street wants to build with no rear yard at all and provide fewer parking spaces than the code requires. Neighboring properties could see a structure come right up to the shared lot line.
Golden/Pippin Drainage Project bids
The board opened a single bid of $45,050 from American Paving and Asphalt for the Golden/Pippin Drainage Project and took it under advisement for review.
Fire Station #3 Retaining Wall Repair
A crash at 18th and South streets earlier this year and ongoing parking lot runoff damaged the retaining wall and handrail at Fire Station #3. The board hired VS Engineering to assess the damage and design repairs for up to $7,000, and the city is seeking reimbursement from the driver involved.
601 Main Street Roof Replacement
The city-owned building at 601 Main Street needs roof work, and the commission chose a patch-and-repair approach over full replacement to save money. The decision reflects planned future use of the downtown property.
Durkee's Run Ditch drainage study
The city is engineering a fix for stormwater at Ninth and Cassuth and will eventually release water into Durkee's Run Ditch. This study checks that the watershed can handle it without adding flow during storms, so problems aren't pushed downstream. The main project is targeted for 2028.
New County Thoroughfare Plan
A resolution was scheduled to amend the county comprehensive plan to include a new thoroughfare plan, guiding future road corridors and how the area grows.
Aggressive Dogs and Evening Animal Control
A resident described repeated incidents with an aggressive dog and no animal control after 10 p.m., asking for a clear response policy and evening coverage.
Woodmere Drive Rezoning (NB to R2)
A petition from Beatriz Arteaga Montes was scheduled to rezone properties at 823 & 827 Woodmere Drive from neighborhood business (NB) to residential (R2), changing what can be built there.
Countywide Zoning and Subdivision Ordinance Amendments
Three ordinances amending Tippecanoe County's unified zoning and subdivision ordinances (UZO 127, USO 15, UZO 129) were scheduled for first reading. These text amendments shape what can be built and how developments are laid out across the county.
Concrete repairs and Greenbush Cemetery sidewalk move forward
Six contractors bid on building a sidewalk at Greenbush Cemetery using CDBG funds, with the low bid at $104,828. The board is reviewing the bids before picking a winner.
Historic district building projects approved
Four ordinances reshaped Lafayette's local historic districts: the Downtown and Upper Main districts expanded, St. Mary's/1116 Columbia was renamed and enlarged, and a brand-new Erie Street district was created. Property owners in the affected areas now fall under local preservation review.
2026 Asphalt Rejuvenation Project change order
The annual pavement-treatment program is done for the year. A $1,245.87 deduction reflects spots the contractor skipped — near a couple of intersections — because the sealant makes pavement briefly slick.
Habitat for Humanity housing project deadline extensions
Two city-funded Habitat homes hit a snag: the buyers need more time to fix their credit and finish required pre-purchase counseling before closing. The board extended the deadlines so the affordable homes can still be sold, rather than the deals falling through.
Sewer Projects Completed Under Budget
Two Lafayette Renew projects — the Prairie Oaks permanent bypass and the 2025 sanitary sewer rehab — wrapped up with small deductions instead of overruns, though the Prairie Oaks schedule slipped 243 days due to material delays and wet weather.
ADA ramp upgrades near Columbian Park and citywide sidewalks
Two change orders add money to make more sidewalks and curb ramps ADA-compliant — 140 square yards of transition sidewalk in the Columbian Park neighborhood and nine more citywide fixes in the 2025 concrete program.
Torchwood Subdivision street repairs
Two bids for repairing streets in the Torchwood Subdivision came in nearly identical — about $78,000 each. The board is holding both under advisement before choosing.
CR 400 S Sewer Extension Right-of-Way Acquisition
The city hired Egis to handle property acquisition for a sewer extension along CR 400 S, which will also help extend service to the second phase of the Chesapeake Point subdivision.
2026 Paving Loop Replacement
The city is hiring Signal Construction for $39,322.50 to keep up its annual paving loop — routine street resurfacing that keeps roads in rotation before they deteriorate. Signal beat two other quotes by over $20,000.
Community events approved for October
Main Street from 6th to 9th closes October 24 from noon to 5 p.m. for a family-friendly downtown Halloween festival, approved pending an insurance paperwork fix.
Public Safety Center Amenity Deck Repair
The grassy second-floor deck at the Public Safety Center isn't sealing properly and water has been leaking into sensitive areas of the building. The fix — swapping grass for concrete pavers — will cost up to $68,877 and was rushed ahead of cold weather.
2026 Miscellaneous Concrete Project #2 bids
Dixon Construction won the low quote at $55,842 to fix ADA issues and miscellaneous concrete problems across the city, with work starting immediately.
Weekly city claims payment
The board signed off on $489,520.74 in claims, including about $40,000 for police vest packages.
Fairfield Manufacturing abatement recapture settlement
After Dana sold its Lafayette facility to Allison Transmission and moved abated equipment out of the district, the city enforced its clawback and settled for half the abated taxes — $150,495.78 going to the general fund.
N. 19th Street Concrete Project Completed
The city opened bids for concrete work on South 5th Street, with the low bid at $167,031. An award is on hold while staff reviews the three bids.
Crouch Street Concrete Patching Project
The city opened bids around $112,000 to patch concrete on Crouch Street; a contractor hasn't been picked yet.
S. 5th Street Concrete Improvements
Crouch Street gets concrete patching under a new $111,731 contract with Dixon Construction, and work started the same day the board approved it.
Durkees Pond Improvement Project
The detention pond by the old Durgin School is undersized and its sides fail during heavy rain. The city is hiring engineers to design an expansion.
Treece Meadows Concrete Project, Phase 1
Deteriorated street concrete found during construction added $35,563 to the neighborhood patching project, now at $233,032.
2027 Opioid Settlement Grants
About $430,000 in opioid settlement money will be granted out in 2027 to organizations running addiction-abatement programs for Lafayette residents.
Park East Boulevard Roundabout Resurfacing
The city, Atlas Excavating and Milestone split the cost of milling and resurfacing the Park East/Haggerty Lane roundabout — the city's share is $126,500.
Sale of 605 Main Street
No one offered to buy 605 Main Street, so after 30 days the city can negotiate openly with interested buyers for the former Long Center expansion property.
Pearl River Sewer relocation study at 5th and Alabama
The city is studying how to move a section of the Pearl River sewer that sits inside the former Lafayette Tent and Awning development site at 5th and Alabama. Moving it clears the way for redevelopment of that property.
Habitat for Humanity home rehabilitation at 1120 N. 7th Street
The city is putting up to $110,000 through the Lafayette Housing Consortium into fixing up a home on North 7th Street and helping an eligible buyer purchase it. It's another piece of the city's affordable housing pipeline.
CAT Park restroom and Community Garden projects
The CAT Park restroom building is still under construction, and the long-planned Community Garden is getting closer to opening. Both are ongoing parks projects residents have been waiting on.
Bond fund claims spending
The bulk of this month's payments — about $891,000 — came from the bond fund, likely tied to capital projects like the CAT Park restroom. The board pays these routinely each meeting.
Parks budget update through June
The city controller told the board revenues are beating expenses so far this year, but late summer bills are still rolling in. A possible extra appropriation for the Banana Peel slide repair may come later in the year.
Columbian Park primate exhibit progress
Construction is moving along — duct work is going in and the concrete viewing panel wall is being poured, with landscaping designed around animal safety.
Creasy/Central TIF Plan Expansion
The council approved adding new projects to the Consolidated Creasy/Central economic development area plan, expanding how tax-increment financing can be used in that corridor.
St. James Church boiler room demolition at 800 Cincinnati Street
The Lafayette Renew wastewater plant's second boiler is being replaced by D.A. Dodd, LLC for $148,900, keeping the plant's heating and treatment operations running.
Zoo primate building project
The Columbian Park Zoo's primate building construction is moving along smoothly. The big bond-funded spending approved this meeting likely supports this and other capital work.
Senior Home Assistance Repair Program extension
The city extended its agreement with Tippecanoe Senior Services through December 31, 2026, so low-income seniors can keep receiving home repair help. The extension covers reimbursement of the agency's operating costs after the original agreement expired June 30.
Economic Revitalization Area and Property Tax Abatement
The council confirmed an Economic Revitalization Area designation and approved a property tax abatement application, capping off a process that included a public hearing with no comments. Abatements trade some future property tax revenue for encouraging business investment in Lafayette.
Joint Human Relations Commission with West Lafayette and Tippecanoe County
The interlocal agreement creating a shared Human Relations Commission was tabled at the council's request, so its future is on hold for now.