Durkee's Run Ditch drainage study
Summary
The city is engineering a fix for stormwater at Ninth and Cassuth and will eventually release water into Durkee's Run Ditch. This study checks that the watershed can handle it without adding flow during storms, so problems aren't pushed downstream. The main project is targeted for 2028.
At a glance
- Total mentions
- 1
- Last 30 days
- 1
Discussed at 1 meeting in the last 60 days; most recently Nov 3, 2026.
Impact analysis
The study itself costs $104,400, with the bigger project coming in 2028.
Residents near Ninth and Cassuth and along Durkee's Run get a stormwater fix that won't flood the next neighborhood over.