Bond Refunding Pre-Authorization
The commission pre-approved refinancing old bonds, but only if savings hit at least 3% — no term extension, and it acts like a mortgage pre-approval to move fast if rates drop.
WLPD officer shortage and recruitment
The merit commission is set to certify the lists that control who can be hired and promoted in the West Lafayette Police Department. It's the administrative gate for growing and staffing the force.
Pedestrian Safety at Fowler Avenue & Wiggins Street
The commission is reviewing pedestrian safety at the intersection of Fowler Avenue and Wiggins Street to see if crosswalk or signal upgrades are needed. Safe crossings in this area are important for students and neighborhood residents navigating daily traffic.
Frontier Fiber Optic Cable Project in New Chauncey
Frontier will bury about 8,219 feet of fiber cable along nine New Chauncey streets using directional drilling, with flush-mounted access points and no new poles or overhead lines. The city requires buried utilities in the historic district, and the subcommittee was satisfied on tree protection, lawn restoration, and resident notification.
New Chauncey Neighborhood Land Use Plan update
The council voted to ask the APC to update the 2013 neighborhood plan — data corrections and strategy updates only, no new goals. Residents fear it could open the door to teardowns and apartments; officials stressed it's a study request with multiple public input steps ahead.
Northside Regional Lift Station Expansion
Crews will take soil borings at multiple locations through September 16 for the North Side Regional Lift Station and Force Main upgrade, one lane closure at a time.
Semiconductor Facility Third-Party Plan Review
Building Commissioner Jason Hardebeck reported F.A. Wilhelm has scheduled six concrete pours for the Indiana FAB project in August, including one Saturday (Aug. 8), following last week's weekend-work concerns.
Fire Station 3 Expansion
The city is rezoning and expanding Fire Station No. 3 to add a second fire crew, more bays, and room for 12 new firefighters funded by a federal SAFER grant. The north side has grown a lot since the station was built in 2011, and response coverage has lagged.
Duke Energy Easement at Happy Hollow Park
The board approved an easement so Duke Energy can move overhead power lines underground at the back corner of Happy Hollow Park near the elementary school and pool, a condition tied to the project's land and water conservation grant. Staff say the buried lines won't limit future park design.
$6 Million Lilly Grant Application and Master Plan Update
Parks staff will ask the board in December to release RFPs to update the citywide master plan, create mini master plans for each park, update the park impact fee ordinance, and hire a Happy Hollow Phase 1 contractor — all feeding a $6 million Lilly fund grant application in August.
SK Hynix Site A Temporary Parking Lot
The chip plant build will add up to 3,000 vehicles a day on Yeager, Sagamore, and area roads at peak (fall 2027–spring 2028), plus ~30 heavy trucks daily on a fixed Sagamore-Yeager route. New signals and turn lanes are planned, and SK will bus workers from off-site parking.
Public Safety Center construction
Roof work is wrapping up on the second level, with police moving in by year's end; AV and appliances remain to be procured.
Alignment of merit commission rules with state law
The commission changed WLPD's hiring rules so candidates no longer need 60 college credit hours — now the state minimums apply. The department is short-staffed and says a bigger candidate pool will help, while still encouraging education through tuition reimbursement.
Happy Hollow Park Improvements Phase I contract transfer
A long-awaited Land and Water Conservation Fund grant finally came through after two years — about $482,000 matched with park impact fees for a roughly $1 million project starting spring 2027. Work includes burying electric and fiber lines, new play nodes, a children's program area, and an overlook from Happy Hollow Road. Phase two would tackle parking safety and a community program center.
HEA 1001 Housing Development Hearing
Landlords will report more data — including whether they use algorithmic rent-setting software — to meet the state's new annual housing report. Large operators (50+ beds) report annually. Residents asked for fee disclosures, per-unit pricing, and digitized public data.
Municipal Data Governance Policy and Flock Camera Concerns
A resident warned the city's Flock cameras do far more than read plates — they log vehicle types and allow near-limitless searches — and asked how the data is used and what it costs. He's talking with the police chief and wants the council's thoughts.
Opioid Settlement Funds Appropriation
TROSCC formally asked West Lafayette for about $200,000 of its opioid settlement share; overdose deaths in the county fell from 57 in 2021 to 19 in 2025. The city's own committee will decide and vote in February.
Wastewater System Development Charge
New sewer connections will pay $2,500 to $400,000 depending on meter size, replacing the old flat $400 tap fee, with money going to infrastructure. Builders say they understand the need after staff meetings but worry about housing costs; the Indiana Apartment Association opposes it.
Pedestrian crossing improvements citywide
The Street Department will upgrade rapid flashing beacons, replace a problematic school flasher system at Cumberland, and add radar speed signs that flash red and blue lights during school hours. Concerns about speeding near the Willis school crossing were a key driver.
Fire Station 1 radio and equipment replacement
The commission clawed back $775,525 from contractor Kettelhut and immediately spent it on a state-of-the-art fire station alerting system and building-wide access control and cameras. The alerting system wakes only the firefighters who respond — cutting roughly 30-60 seconds off emergency response and protecting firefighter sleep health. The overall $73 million project cost does not increase.
Fire Station 3 Construction
The station's funding rose to $10 million; bids open October 6 and the $13-15 million project should be done in early 2028. Motorola equipment pricing was locked in early.
425 Connector and Salisbury Roundabout
The closure of Salisbury between Kalberer and CR 500 includes replacing two big culverts over Boes Ditch — a protected waterway — and building a roundabout. Mayor Easter says it should reopen to north-south traffic around December 1, and power lines are being buried citywide as an ongoing effort.
CR 425 road construction delay
Several residents said the root problem is that County Road 425 was never built before the northern subdivisions expanded, leaving Westmoreland as the only route. The section now has no construction schedule.
Salisbury Street / County Road 425 Construction
The closure of Salisbury between Kalberer and CR 500 includes replacing two big culverts over Boes Ditch — a protected waterway — and building a roundabout. Mayor Easter says it should reopen to north-south traffic around December 1, and power lines are being buried citywide as an ongoing effort.
Sale of 2016 N Salisbury Street to Citation Homes
The vacant Salisbury lot sold to Citation Homes for $137,500, beating out Suree Lee's bid. Citation plans to build within 30 to 60 days and already has a floor plan ready.
810 North Grant Street property offer
The city closed on the 810 N Grant Street property under budget (~$218,000), with street crews cleaning up the site and interior demolition starting soon.
Water Quality and Stormwater Management in Tippecanoe County
Experts say non-point source pollution — lawn fertilizer, pet waste, and litter washing into storm drains — is a major threat to local waterways, and Indiana has lost most of its historic wetlands. Rain gardens, native plantings, and keeping water on your property help.
Next firefighter hiring process
The commission rewrote the firefighter selection process to add virtual interviews and written testing before in-person interviews, and set who pays the testing platform fee. The changes aim to give commissioners more information about candidates earlier and keep applicants committed once they've invested money in the process.
West Lafayette Fire Foundation
Donations are less than half of last year's pace, mostly because the annual report fundraising mailer went out late. The mailer finally landed in June, Bill Evers is now leading fundraising through December, and the group hopes to close the gap.
Firefighter hiring standards on marijuana/cannabis use
The Fire Merit Commission is updating its rules on marijuana use for firefighter applicants, moving away from a strict two-year ban toward a case-by-case review of legality, recency, and public trust. The change keeps applicants who legally used cannabis out of state eligible, while blocking Indiana violations. Adoption comes after a public hearing at the October meeting.
Meijer #186 Subdivision Variance (North 200 West Dedication)
Developers of the former Meijer site on US 52 West wanted out of dedicating 1.66 acres for a future North 200 West widening, arguing it's an unconstitutional taking without compensation. The Board unanimously said no, meaning the dedication requirement stands and future road work would proceed through condemnation with payment.
Meijer #186 Subdivision Variance (S-5376)
Developers want to dedicate less right-of-way along US 231 than the subdivision ordinance requires for a 5-lot commercial subdivision on 9.41 acres near US 52 and CR 250 W. The Board put off its decision a week over unresolved questions.
US 52 subdivision variance and road land dispute
Developers want to build a retail subdivision near Meijer but are fighting the city's demand for 1.66 acres of free right-of-way for a future US 231/N 250 W road project. The board tabled the variance while members learn more about the legal fight, which could head to court.
Flock License-Plate Cameras and Surveillance Limits
Data retention drops from 30 to 7 days and the system is barred from adding voice/video recording — but a long line of residents urged the council to end the Flock contract entirely, citing data sharing, third-party access, and Fourth Amendment concerns. The conversation will continue.
Sewer Rate Increases and $85 Million Wastewater Expansion
Sewer bills rise 2% a year for four years, and the city is bonding up to ~$85 million — financed partly at a low 2.87% state rate — to expand the wastewater plant's capacity from 10.5 to 15 million gallons a day. The bonds don't add new rate increases thanks to SK hynix grant funds and growth.
Sale of 2016 N. Salisbury Street with owner-occupied deed restriction
The Enrichment Foundation approved a sale offer for the lot, with a deed restriction requiring the buyer to live in the home — keeping it as owner-occupied housing.
Owner-occupied deed restrictions for Foundation properties
The Foundation is using perpetual owner-occupied deed restrictions to keep its purchased properties as single-family, owner-occupied homes rather than rentals. The 810 N. Grant restriction is now the standard form for all future properties. State law changes could limit this tool, and members acknowledged it may be tested in court.
Wastewater utility finances and future rate increase
The 2025 utility report shows solid finances and a likely request later this year for another 2% inflationary increase — under $1 a month for the average customer. Sanitation fees are running short, prompting a review of routing and billing alternatives. The average residential bill is about $48 a month.
Wastewater Treatment Plant Modernization and Expansion
The big wastewater plant expansion is about two weeks behind on design — 90% drawings expected mid-July, which kicks off state permit review and the contractor's guaranteed maximum price. The new admin/lab building is also stalled waiting for piling equipment after crews hit old concrete dumped at the site decades ago.
2026 Pavement Resurfacing Bids (Three Neighborhoods)
The city opened bids for resurfacing Amberleigh Village, Blackbird Farms, and Hills and Dales streets using a 50/50 state-local matching grant. Contracts will be awarded after review — Rieth-Riley was lowest on all three.
Amberleigh Village and Blackbird Farms resurfacing
Three neighborhoods get their streets resurfaced this year, with the state covering half the roughly $1.26 million bill through the Community Crossings Matching Grant. Blackbird Farms streets will also get milling and patching.
Offer sheet criteria and sale of 810 N. Grant Street
The City's house at 810 N. Grant Street tested at 9.3 pCi/L — more than double the EPA mitigation threshold — so it will get a radon system before it's sold with an owner-occupied deed restriction.
2027 Spending Plan Boosted by $5.6 Million
Stronger-than-expected TIF growth freed up $5.6 million, letting the commission fund more project requests including Fire Station 3, police cars, IT servers, and parks equipment. Tentative approval comes in October and final approval in December.
Sewer lining near Soldiers Home Road
The city is lining a 24-inch sewer through a nature preserve before it collapses, avoiding a far more destructive open-cut repair.
ADA access at Tommy Johnston park
A CDBG-funded project will replace mulch with an ADA-compliant surface and connective sidewalk at Wood Street and South Chauncey.
Downtown and Oakwood Village land use plan update
City Council approved updating the 2013 New Chauncey Neighborhood Land Use Plan without notice to the Historic Preservation Commission, whose existence stems from that plan. Commissioners are seeking early involvement with the Area Plan Commission, concerned that implementation strategies — the rules shaping the neighborhood's future — are open to change.
Wabash Township fire/EMS funding through the Public Safety Local Option Income Tax
Wabash Township has asked four years running for a slice of the public safety income tax it residents pay into but never receive for fire and EMS. West Lafayette voted 6-2 to back the $750,000 request, but the county and Lafayette must also act; without a rate increase the city would lose about $90,000 next year.
Flock Camera Surveillance and Privacy
Multiple speakers urged the city to cancel or pause its Flock license plate reader program, citing privacy risks, AI integration, and the company's investor ties. The council president said police and IT are engaged, meetings with Flock are set, and answers should come next month.
Early Childhood Education Center Feasibility
The first community input session on the planned early childhood education center was postponed for weather, but the online survey at WLMoves.com stays open. The design team will pick a new date, and a second session is set for September 2.
New road connecting Parkview Hospital to Kalberer Road
Parkview Hospital's development gets a permanent road to Kalberer Road, dedicated to the public once built. The city decides whether a traffic signal is warranted there, with Parkview footing the initial bill if so. Mayor Easter noted the new temporary signal at Kalberer and Yeager could complicate that, since signals placed too close together may preclude the Parkview one.