HighTaxes Budget

Bond Refunding Pre-Authorization

The commission pre-approved refinancing old bonds, but only if savings hit at least 3% — no term extension, and it acts like a mortgage pre-approval to move fast if rates drop.

2 mentions (1 this month)Last discussed Nov 20, 2026
HighPublic Safety

WLPD officer shortage and recruitment

The merit commission is set to certify the lists that control who can be hired and promoted in the West Lafayette Police Department. It's the administrative gate for growing and staffing the force.

3 mentions (1 this month)Last discussed Nov 19, 2026
HighRoads

Pedestrian Safety at Fowler Avenue & Wiggins Street

The commission is reviewing pedestrian safety at the intersection of Fowler Avenue and Wiggins Street to see if crosswalk or signal upgrades are needed. Safe crossings in this area are important for students and neighborhood residents navigating daily traffic.

1 mention (1 this month)Last discussed Nov 18, 2026
HighPublic Safety

Fire Station 3 Expansion

The city is rezoning and expanding Fire Station No. 3 to add a second fire crew, more bays, and room for 12 new firefighters funded by a federal SAFER grant. The north side has grown a lot since the station was built in 2011, and response coverage has lagged.

4 mentions (1 this month)Last discussed Nov 17, 2026
HighWater Utilities

Northside Regional Lift Station Expansion

Crews will take soil borings at multiple locations through September 16 for the North Side Regional Lift Station and Force Main upgrade, one lane closure at a time.

7 mentions (1 this month)Last discussed Nov 17, 2026
HighZoning

New Chauncey Neighborhood Land Use Plan update

The council voted to ask the APC to update the 2013 neighborhood plan — data corrections and strategy updates only, no new goals. Residents fear it could open the door to teardowns and apartments; officials stressed it's a study request with multiple public input steps ahead.

10 mentions (2 this month)Last discussed Nov 17, 2026
HighInfrastructure

Frontier Fiber Optic Cable Project in New Chauncey

Frontier will bury about 8,219 feet of fiber cable along nine New Chauncey streets using directional drilling, with flush-mounted access points and no new poles or overhead lines. The city requires buried utilities in the historic district, and the subcommittee was satisfied on tree protection, lawn restoration, and resident notification.

2 mentions (2 this month)Last discussed Nov 17, 2026
HighDevelopment

Semiconductor Facility Third-Party Plan Review

Building Commissioner Jason Hardebeck reported F.A. Wilhelm has scheduled six concrete pours for the Indiana FAB project in August, including one Saturday (Aug. 8), following last week's weekend-work concerns.

6 mentions (2 this month)Last discussed Nov 17, 2026
HighParks Rec

$6 Million Lilly Grant Application and Master Plan Update

Parks staff will ask the board in December to release RFPs to update the citywide master plan, create mini master plans for each park, update the park impact fee ordinance, and hire a Happy Hollow Phase 1 contractor — all feeding a $6 million Lilly fund grant application in August.

1 mention (1 this month)Last discussed Nov 16, 2026
HighParks Rec

Duke Energy Easement at Happy Hollow Park

The board approved an easement so Duke Energy can move overhead power lines underground at the back corner of Happy Hollow Park near the elementary school and pool, a condition tied to the project's land and water conservation grant. Staff say the buried lines won't limit future park design.

1 mention (1 this month)Last discussed Nov 16, 2026
HighDevelopment

SK Hynix Site A Temporary Parking Lot

The chip plant build will add up to 3,000 vehicles a day on Yeager, Sagamore, and area roads at peak (fall 2027–spring 2028), plus ~30 heavy trucks daily on a fixed Sagamore-Yeager route. New signals and turn lanes are planned, and SK will bus workers from off-site parking.

2 mentions (1 this month)Last discussed Nov 10, 2026
HighPublic Safety

Public Safety Center construction

Roof work is wrapping up on the second level, with police moving in by year's end; AV and appliances remain to be procured.

11 mentions (1 this month)Last discussed Nov 10, 2026
HighPublic Safety

Alignment of merit commission rules with state law

The commission changed WLPD's hiring rules so candidates no longer need 60 college credit hours — now the state minimums apply. The department is short-staffed and says a bigger candidate pool will help, while still encouraging education through tuition reimbursement.

4 mentions (1 this month)Last discussed Nov 9, 2026
HighParks Rec

Happy Hollow Park Improvements Phase I contract transfer

A long-awaited Land and Water Conservation Fund grant finally came through after two years — about $482,000 matched with park impact fees for a roughly $1 million project starting spring 2027. Work includes burying electric and fiber lines, new play nodes, a children's program area, and an overlook from Happy Hollow Road. Phase two would tackle parking safety and a community program center.

4 mentions (2 this month)Last discussed Nov 5, 2026
HighPublic Safety

Opioid Settlement Funds Appropriation

TROSCC formally asked West Lafayette for about $200,000 of its opioid settlement share; overdose deaths in the county fell from 57 in 2021 to 19 in 2025. The city's own committee will decide and vote in February.

3 mentions (1 this month)Last discussed Nov 2, 2026
HighWater Utilities

Wastewater System Development Charge

New sewer connections will pay $2,500 to $400,000 depending on meter size, replacing the old flat $400 tap fee, with money going to infrastructure. Builders say they understand the need after staff meetings but worry about housing costs; the Indiana Apartment Association opposes it.

13 mentions (1 this month)Last discussed Nov 2, 2026
HighDevelopment

HEA 1001 Housing Development Hearing

Landlords will report more data — including whether they use algorithmic rent-setting software — to meet the state's new annual housing report. Large operators (50+ beds) report annually. Residents asked for fee disclosures, per-unit pricing, and digitized public data.

4 mentions (1 this month)Last discussed Nov 2, 2026
HighPublic Safety↑Rising

Municipal Data Governance Policy and Flock Camera Concerns

A resident warned the city's Flock cameras do far more than read plates — they log vehicle types and allow near-limitless searches — and asked how the data is used and what it costs. He's talking with the police chief and wants the council's thoughts.

11 mentions (4 this month)Last discussed Nov 2, 2026
HighPublic Safety

Fire Station 1 radio and equipment replacement

The commission clawed back $775,525 from contractor Kettelhut and immediately spent it on a state-of-the-art fire station alerting system and building-wide access control and cameras. The alerting system wakes only the firefighters who respond — cutting roughly 30-60 seconds off emergency response and protecting firefighter sleep health. The overall $73 million project cost does not increase.

2 mentions (1 this month)Last discussed Oct 28, 2026
HighRoads

Pedestrian crossing improvements citywide

The Street Department will upgrade rapid flashing beacons, replace a problematic school flasher system at Cumberland, and add radar speed signs that flash red and blue lights during school hours. Concerns about speeding near the Willis school crossing were a key driver.

2 mentions (2 this month)Last discussed Oct 28, 2026
HighPublic Safety

Fire Station 3 Construction

The station's funding rose to $10 million; bids open October 6 and the $13-15 million project should be done in early 2028. Motorola equipment pricing was locked in early.

3 mentions (1 this month)Last discussed Oct 21, 2026
HighRoads

425 Connector and Salisbury Roundabout

The closure of Salisbury between Kalberer and CR 500 includes replacing two big culverts over Boes Ditch — a protected waterway — and building a roundabout. Mayor Easter says it should reopen to north-south traffic around December 1, and power lines are being buried citywide as an ongoing effort.

8 mentions (2 this month)Last discussed Oct 21, 2026
HighRoads

Salisbury Street / County Road 425 Construction

The closure of Salisbury between Kalberer and CR 500 includes replacing two big culverts over Boes Ditch — a protected waterway — and building a roundabout. Mayor Easter says it should reopen to north-south traffic around December 1, and power lines are being buried citywide as an ongoing effort.

1 mention (1 this month)Last discussed Oct 20, 2026
HighRoads

CR 425 road construction delay

Several residents said the root problem is that County Road 425 was never built before the northern subdivisions expanded, leaving Westmoreland as the only route. The section now has no construction schedule.