Top issues during term (20)(Roads)
Oak Hill Road project and temporary speed limit
$21,600 paid from Burkhart TIF funds for mitigation credits.
University Parkway improvements for Old Farm development
Up to $10.5 million in TIF bonds, repaid by the developer's own captured tax increment with no recourse to the county.
Fieldstone I failing streets
Fixing it now likely saves the county money later — the $75,188 letter of credit is based on 2017 construction costs.
County Road Resurfacing and Oak Hill Reconstruction Change Orders
About $68,400 in combined contract increases to county road projects.
Mesker Park Bridge replacement funding
County share roughly 20% of an estimated $1.5 million if the federal grant comes through.
Hogue Road Bridge #860 replacement funding
Up to $200,000 for design now; full contract estimated near $600,000 with federal funds covering most of it.
Temporary Speed Limit Reduction on Clover Drive
Petersburg Road project expansion
Estimated $250,000–$350,000 for the Petersburg Road widening, plus unfunded repair responsibility questions.
Replacement of Bridge #1580 on Old State Road
Up to $200,000 for design now; full contract estimated near $600,000 with federal funds covering most of it.
Boonville-New Harmony Road reconstruction change order
County road funds absorb a $204,719.81 increase.
INDOT Community Crossings paving grant application
Half of $1.27 million — about $637,121 — comes from county funds if the grant is awarded.
Jeremy Ryan Tighe Memorial Way
Minor cost for sign replacement within the traffic department's normal operations.
Landfill Tipping Fees and Red Bank Road
Tipping fees bring roughly $470,000–$500,000 a year; a statutory increase to $2.50/ton could add about 20%.
Highway Department Budget and Facility Needs
Roughly $210,000 in requested line-item increases plus FEMA funds for a heating system.
Broadway Avenue Bridge #274 replacement change order
Adds $6,157.95 to the bridge replacement contract.
State Road Funding Uncertainty
Roughly $1.4 million in Community Crossings paving work this year, plus a concrete repair contract expected this summer — against road needs the engineer says far exceed available money.
Concrete street repairs contract
$704,241.20 contract.
SR 57 Roundabout Detour at Green River Road
INDOT reimburses the county for detour-related road damage.
County Highway aging equipment
Roughly $300K for a paver plus five aging dump trucks; contract paving costs will rise meanwhile.
Wimberg Bridge design change funding
$105,000 added to the Cumulative Bridge fund.
Decisions during term (7)
Recorded while Raben was in office — not necessarily decisions they moved, spoke to, or voted on.
Change Order #1: Milling and Resurfacing of County Roads
Change Order #1: VC26-01-01 Milling and Resurfacing of County Roads
Award Bid: VC26-04-01 Repair and Resurfacing of County Roads to E&B Paving, LLC
2025 Annual Operational Report for Local Roads and Streets and Bridges
Open Bids: VC26-04-01 Repair and Resurfacing of County Roads
Notice to Bidders: VC26-04-01 Repair and Resurfacing of County Roads
3D Leasing utility location at Baseline and Volkman Roads
Voting record (0)(Roads)