2027 Utility Emergency Repairs Bidding
The city wants to line up contractors on call for emergency water and utility repairs throughout 2027, so broken mains and lines get fixed fast.
Golden/Pippin Drainage Project bids
The board opened a single bid of $45,050 from American Paving and Asphalt for the Golden/Pippin Drainage Project and took it under advisement for review.
Durkee's Run Ditch drainage study
The city is engineering a fix for stormwater at Ninth and Cassuth and will eventually release water into Durkee's Run Ditch. This study checks that the watershed can handle it without adding flow during storms, so problems aren't pushed downstream. The main project is targeted for 2028.
Sewer Projects Completed Under Budget
Two Lafayette Renew projects — the Prairie Oaks permanent bypass and the 2025 sanitary sewer rehab — wrapped up with small deductions instead of overruns, though the Prairie Oaks schedule slipped 243 days due to material delays and wet weather.
CR 400 S Sewer Extension Right-of-Way Acquisition
The city hired Egis to handle property acquisition for a sewer extension along CR 400 S, which will also help extend service to the second phase of the Chesapeake Point subdivision.
Durkees Pond Improvement Project
The detention pond by the old Durgin School is undersized and its sides fail during heavy rain. The city is hiring engineers to design an expansion.
Pearl River Sewer relocation study at 5th and Alabama
The city is studying how to move a section of the Pearl River sewer that sits inside the former Lafayette Tent and Awning development site at 5th and Alabama. Moving it clears the way for redevelopment of that property.
Glick Water Transmission Main Feasibility Study
The city is studying whether it can run a large water transmission main from the Glick Wellfield to the upper pressure system. BF&S will evaluate routes and feasibility in 75 days for $47,400.
RFQ-2026 Renew Boiler #2 Replacement Project
Bid awards for the boiler #2 replacement remain on hold while the board evaluates the two bids received.