2027 Utility Emergency Repairs Bidding
The city wants to line up contractors on call for emergency water and utility repairs throughout 2027, so broken mains and lines get fixed fast.
Golden/Pippin Drainage Project bids
The board opened a single bid of $45,050 from American Paving and Asphalt for the Golden/Pippin Drainage Project and took it under advisement for review.
Durkee's Run Ditch drainage study
The city is engineering a fix for stormwater at Ninth and Cassuth and will eventually release water into Durkee's Run Ditch. This study checks that the watershed can handle it without adding flow during storms, so problems aren't pushed downstream. The main project is targeted for 2028.
Sewer Projects Completed Under Budget
Two Lafayette Renew projects — the Prairie Oaks permanent bypass and the 2025 sanitary sewer rehab — wrapped up with small deductions instead of overruns, though the Prairie Oaks schedule slipped 243 days due to material delays and wet weather.
CR 400 S Sewer Extension Right-of-Way Acquisition
The city hired Egis to handle property acquisition for a sewer extension along CR 400 S, which will also help extend service to the second phase of the Chesapeake Point subdivision.
Durkees Pond Improvement Project
The detention pond by the old Durgin School is undersized and its sides fail during heavy rain. The city is hiring engineers to design an expansion.
Pearl River Sewer relocation study at 5th and Alabama
The city is studying how to move a section of the Pearl River sewer that sits inside the former Lafayette Tent and Awning development site at 5th and Alabama. Moving it clears the way for redevelopment of that property.
Glick Water Transmission Main Feasibility Study
The city is studying whether it can run a large water transmission main from the Glick Wellfield to the upper pressure system. BF&S will evaluate routes and feasibility in 75 days for $47,400.
RFQ-2026 Renew Boiler #2 Replacement Project
Bid awards for the boiler #2 replacement remain on hold while the board evaluates the two bids received.
New sewer connection system development charge
Ordinance 2026-17 creates a charge that must be paid before connecting to the city's sewage works or requesting additional capacity, and moves the process entirely in-house. A public hearing is set for June 1 — developers and builders will want to watch this one.
Water Works disinfection change and engineering support
New on-call engineering agreement with Wessler plus a $58,100 task order to redesign how the Canal Road water treatment plant disinfects water and to add disinfection at both booster stations — with IDEM permitting required.
2025 Sewer Rehabilitation Project still undecided
Five bids were opened January 6, ranging from about $835,000 to $1.56 million, but the board is holding them under advisement for further review before making an award.
2026 Water and Wastewater Utility Budgets
The board awarded contracts for the chemicals that keep Lafayette's water and wastewater systems treated. One bidder, Bellrock Chemical, was rejected because its sodium fluoride exceeds the allowed insoluble-matter limit, which could clog delivery lines.