Walnut Street and Michigan Street parking changes

A new 15-minute zone near the University of Evansville and a no-parking rule near Amcor's new cul-de-sac will change street parking in those areas.

1 mention (1 this month)Last discussed Oct 28, 2026
MediumRoads

Oak Hill Road Project Final Phase

The county bought $21,600 in mitigation credits to keep the last phase of Oak Hill Road between St. George and Eastwood moving. Bidding is expected late next year after right-of-way acquisition.

1 mention (1 this month)Last discussed Oct 27, 2026
HighRoads

Fieldstone Subdivision Roads

Fieldstone One's roads are failing and the original developer is gone, so the county agreed to let the new developer fix them now in exchange for accepting them for maintenance — avoiding a possible Barrett Law-style assessment on homeowners later.

1 mention (1 this month)Last discussed Oct 27, 2026
LowRoads

Lynch Road right-of-way dedication

A property owner on Lynch Road near the old drive-in theater formally dedicated 30 feet of right-of-way as the land is subdivided, removing ambiguity about whether the right-of-way exists.

1 mention (1 this month)Last discussed Oct 22, 2026
MediumRoads

Green River Meadows Street Acceptance

Streets in the Orchard North subdivision were originally built badly and rejected for city maintenance. After the city called the developer's letter of credit, a new developer fixed the streets, and the city now takes them over for maintenance.

2 mentions (1 this month)Last discussed Oct 22, 2026
HighRoads

Riverside Drive truck hauling permits

The city cleared a batch of right-of-way permits for construction and utility work in public rights-of-way, with a few applications held back for more information or pending site review.

3 mentions (2 this month)Last discussed Oct 22, 2026
MediumRoads

METS Terminal Renovation Parking Change

The city spent $13,175 more to finish the Metz admin renovations, including repairing a ceiling ruined by a leaking air conditioning unit. Staff say this is the final change order and the project can be closed out.

5 mentions (2 this month)Last discussed Oct 22, 2026
LowRoads

North Main electrical outlet repair

About 20 of roughly 50 electrical outlets along North Main are broken, and the city has put the repair work out to bid so they work for the November 22 parade. Chronic vandalism and age have plagued these outlets since the streetscape was built in 2015-16.

2 mentions (2 this month)Last discussed Oct 20, 2026
HighRoads

2026 Mill and Overlay-Phase III Street Paving

The city is moving ahead with its second phase of 2026 street repaving. Two bids came in, with the lowest at about $201,134, and the Board took them under advisement before awarding a contract.

11 mentions (1 this month)Last discussed Oct 15, 2026
HighRoads

SR 66/Diamond Avenue Corridor Analysis

A new study will map out safety, capacity, walking/biking/transit, and placemaking improvements along Diamond Avenue. It sets the stage for future investments on one of Evansville's key corridors.

2 mentions (1 this month)Last discussed Oct 15, 2026
LowRoads

Canal Street parking dispute resolution

Neighbors have been fighting over parking on narrow Canal Street; the city will designate shoulder parking and add no-parking zones and signs.

1 mention (1 this month)Last discussed Oct 14, 2026
MediumRoads

Downtown event and road closures

A stack of event permits and street closures got the green light for the next few weeks — festivals, a school-bus education day, holiday decorations, and construction work.

2 mentions (1 this month)Last discussed Oct 14, 2026
MediumRoads

Truck permits and road closures

A downtown business owner says he's never been told when his block closes for events, and businesses around him have suffered or closed. The application already requires applicants to notify affected businesses; the board pledged to press applicants and consider warnings or small fines.

3 mentions (1 this month)Last discussed Oct 14, 2026
MediumRoads

Oak Hill Road Reconstruction Change Order

Two change orders added about $68,400 total to road contracts — extra asphalt to fix leveling and drainage problems on resurfaced roads, and tree removal on Oak Hill Road to protect a neighboring house.

4 mentions (1 this month)Last discussed Oct 13, 2026
LowRoads

Temporary speed limit reduction on Clover Drive

A temporary speed limit reduction was proposed for Clover Drive between Elmridge Drive and Bergdolt Road, likely for safety reasons in that neighborhood corridor.

2 mentions (1 this month)Last discussed Oct 13, 2026
HighRoads

2026 Pavement Preservation Project

The city's annual street paving and maintenance program drew a single bid of $980,546.50 from Evergreen Road Works. The board held off on awarding it pending review, so repaving plans hang on the follow-up decision.

6 mentions (1 this month)Last discussed Oct 13, 2026
MediumRoads

Main Street road repairs (Fourth to Fifth Streets)

The Main Street repair project wrapped up under budget, with a final change order trimming $5,504.30 and bringing the total to about $413,778.

1 mention (1 this month)Last discussed Oct 8, 2026
MediumRoads

Old Farm sidewalk waivers

The developer of The Nest Subdivision on Red Bank Road requested a waiver from sidewalk requirements — a question of whether that new neighborhood will have walkable streets.

3 mentionsLast discussed Oct 1, 2026
HighRoads

Tree and sidewalk conflicts

Root-lifted sidewalks keep forcing case-by-case fights between accessibility and tree preservation. A wheelchair user on Lincoln Avenue is currently detouring into the street, and the board wants a real policy — including trying to route sidewalks around trees and testing rubber sidewalk material — instead of defaulting to removal.

7 mentionsLast discussed Oct 1, 2026
MediumRoads

Old Farm sidewalk and trail standards

School officials and the MPO pushed back on waiving sidewalks and on a 6.5-foot trail in a 110-acre subdivision; the commission compromised by requiring an 8-foot path.

1 mentionLast discussed Oct 1, 2026
MediumRoads

Lloyd Expressway/Cross Pointe Roundabout electrical relocation

The city is paying CenterPoint Energy $186,204.22 to relocate streetlights as part of the Cross Pointe roundabout project. A temporary drive will also keep nearby businesses accessible during construction.

3 mentionsLast discussed Oct 1, 2026
MediumRoads

Temporary Speed Limit Reduction on Oak Hill Road

The temporary 20 mph limit on Oak Hill Road between Lynch and Bergdolt Roads continues for another 30 days.

2 mentionsLast discussed Sep 29, 2026
LowRoads

Jeremy Ryan Tighe Memorial Way Designation

The stretch of St. Joseph Avenue at Meier Road is now officially dedicated to Evansville firefighter Jeremy Ryan Tighe, who died in a crash there. A damaged memorial sign will be replaced.

1 mentionLast discussed Sep 29, 2026
MediumRoads

Cross Pointe and Indiana roundabout cost increase

The city was seeking to deposit funds with the county clerk for condemnation proceedings on parcels needed for the Crosspointe Roundabout project. This moves the intersection safety project forward.

3 mentionsLast discussed Sep 24, 2026
MediumRoads

Paving over dormant railroad crossings

Two railroad crossings — on North Green River Road and North Burkhardt Road — will be temporarily paved over because no trains currently use them, making for smoother driving. Full closure still needs INDOT and Federal Highway Administration sign-off.

1 mentionLast discussed Sep 24, 2026
MediumRoads

Cross Pointe roundabout change order

The roundabout project at Cross Pointe and Indiana got a $31,941.85 increase to use fast-curing concrete instead of temporary asphalt, keeping the project on track to finish this year — and should save about $50,000 overall.

1 mentionLast discussed Sep 24, 2026
LowRoads

University of Evansville fall street closures

Walnut Street between Rotherwood and Weinbach will close twice this fall — for the Skele-Fun 5K on October 24 and UE Homecoming on November 7 — plus Olive Street at Rotherwood for the race. Drivers should plan alternate routes.

1 mentionLast discussed Sep 23, 2026
MediumRoads

Handicap parking space removal at 200 W. Louisiana Street

Two residents got new handicap parking spots after explaining they couldn't use driveways or rear parking because of wheelchair lifts and mobility issues.

2 mentionsLast discussed Sep 23, 2026
HighRoads

Speeding near Wesselman Park playground

Two residents and a parks officer described drivers — often tennis and pickleball players — speeding past the new playground, where toddlers step out of cars just 10 feet from the road. Police recommend speed bumps over feedback signs, and the department is exploring traffic-calming options.

3 mentionsLast discussed Sep 16, 2026
MediumRoads

Hogue Road Bridge #860 replacement

The county committed matching funds to apply for federal money to replace the Hogue Road bridge east of Rosenberger. If funded, design starts soon but construction wouldn't begin until July 2031 at the earliest.

2 mentionsLast discussed Sep 15, 2026
MediumRoads

Petersburg Road Design and Construction Funding

Federal money is coming in for the Petersburg Road project, so the county's local TIF share is actually going down.

4 mentionsLast discussed Sep 15, 2026
HighRoads

County road paving via INDOT Community Crossings grant

A $558,222 contract will finally repave roads that haven't been touched since they were built, including sections near the University Parkway ramps, Hillside Terrace and 11th Avenue.

5 mentionsLast discussed Sep 15, 2026
MediumRoads

INDOT statewide active transportation plan

INDOT is writing its first-ever statewide plan for walking and biking and wants public input via an online survey, with an in-person Evansville meeting planned for October.

1 mentionLast discussed Sep 10, 2026
HighRoads

FY 2032 federal highway funding call for projects

The MPO is about to invite applications for federal highway money for projects that must be ready to bid between July and November 2031. Local governments need applications in by the first week of August.

2 mentionsLast discussed Sep 10, 2026
HighRoads

2026-2030 TIP amendments and modifications

Three safety projects on Franklin Street, John Street, and Diamond, Covert, and Lynch roads are being dropped from the federal funding program because they couldn't hit INDOT's timeline for getting money before construction letting. That means those safety fixes will need another funding path.

3 mentionsLast discussed Sep 10, 2026
MediumRoads

2026 street resurfacing (Mill and Overlay Phase III)

Two city roads will be milled and overlaid by December 1 under a $655,099.63 contract with E & B Paving. Drivers on those routes should expect work this fall.

1 mentionLast discussed Sep 10, 2026
MediumRoads

Sidewalk build-out along North Green River Road

Commissioners are requiring sidewalks piece by piece as properties replat along Green River Road — the Bob Evans site lost its waiver 8-0, continuing the incremental sidewalk network north of the Lloyd.

1 mentionLast discussed Sep 3, 2026
MediumRoads

Rosner Road traffic and widening concerns

A Rosner Road resident says construction trucks are already using the road despite promises they wouldn't, and he fears a planned widening will bring subdivision traffic past his home. The developer says the widening only happens inside its 110 acres and traffic is meant to come off University Parkway.

2 mentionsLast discussed Sep 2, 2026
MediumRoads

Petersburg Road expansion funded with Burkhardt TIF

The board signed off on using Burkhardt Road TIF money to pay for an enlarged Petersburg Road design and construction project. More federal grant money comes in, but the county's share of the cost grows too.

1 mentionLast discussed Sep 2, 2026
HighRoads

2026 Mill and Overlay Paving Program

The city signed a $2 million contract to mill and overlay four road segments this year, with state grant money covering a share. Work was expedited because the grant required a signed contract by the next day.

9 mentionsLast discussed Aug 27, 2026
MediumRoads

2026 Street Repaving Program

Bids were opened for the milling and overlay project — lowest at about $2.02 million — and two more maintenance projects (crack sealing and pavement preservation) go out for bid this month.

2 mentionsLast discussed Aug 27, 2026
LowRoads

No-parking restrictions on Tulip and Kotter Avenues

Complaint-driven no-parking signs are coming to Tulip Avenue (too narrow to park) and Kotter Avenue (semi traffic in an industrial area). Residents who park on those streets will need to find other spots.

1 mentionLast discussed Aug 26, 2026
MediumRoads

Traffic engineering equipment and safety needs

Traffic engineering, now under the city engineer, is asking for a second bucket truck, a sign truck, portable message boards, and upgrades to obsolete school flasher timers — plus safety gear and training for crews.

1 mentionLast discussed Aug 26, 2026
LowRoads

Right-of-way encroachment at 2525 Willow Creek Drive

A county right-of-way encroachment agreement at 2525 Willow Creek Drive was scheduled for action, addressing a private use of county right-of-way.

2 mentionsLast discussed Aug 25, 2026
LowRoads

Handicap parking installations and guidance requests

Two new handicap parking spaces were up for approval, and the board was being asked for guidance on three more spots where residents have driveways — a quality-of-life accessibility question.

1 mentionLast discussed Aug 12, 2026
LowRoads

Handicap parking requests on properties with driveways

Three households asked for curb-side handicap spaces despite having driveways. The board tabled the requests, wanting to confirm whether the spaces are truly needed before dedicating scarce street parking.

1 mentionLast discussed Aug 12, 2026
MediumRoads

County Road and Bridge Projects

Concrete street repairs, the Broadway bridge closeout, a Clover Drive speed-limit extension, and the Boonville-New Harmony water line reimbursement all moved forward.

1 mentionLast discussed Aug 10, 2026
HighRoads

University Parkway improvements for Old Farm development

The Old Farm development's parkway improvements were approved with a J-turn instead of a traffic signal — something westside Commissioner Goebel said he's glad to see. Dirt is already moving, though rain has slowed work.

3 mentionsLast discussed Aug 10, 2026
LowRoads

Right-of-way permits and road closures

The Board approved a batch of right-of-way permits, including a last-minute emergency permit for AT&T to cut into Southeast Eighth Street and repair a damaged conduit.

2 mentionsLast discussed Aug 6, 2026
HighRoads

Tree vs. sidewalk conflict policy

The city keeps hitting cases where tree roots destroy sidewalks, and there's no consistent rule for when a tree comes out. Staff are researching costs and other cities' approaches, with a case-by-case framework expected next month.

1 mentionLast discussed Aug 6, 2026