Top issues during term (20)(Roads)
Bridge 133 Replacement
Up to $106,700, paid from already-appropriated 2026 funds.
Road closures for Bridge 2805 and water line work
Repair costs fall on the resident for now, pending any tort claim outcome.
International Drive Extension with Jamestown
County advances the 20% local match, with Jamestown reimbursing half (10% of project costs).
Boone Area Transit System Ridership Struggles
The county helps fund a $401,817 federal grant match, supplemented by fundraising and an $85,179 state match.
Bridge 37 Rigid Deck Overlay Inspection
$268,190.14 for the RAM contract; bridge overlay bids pending award.
Road projects and roundabout opening
Projects funded through a mix of general fund, bond, ARP, Community Crossings, and federal aid dollars.
All-way stop at CR 300 S and 500 E
CR 400 E pavement repairs
Roughly $22,320 in repairs, fully reimbursed by INDOT.
All-Way Stop at CR 300 S and CR 500 E
The pavement markings for the new stop cost about $1,606 through the consent agenda.
Summer road closures across the county
Lebanon reimburses ~$255,523.56 of road work; bridge overlays cost up to $81,581 from bridge preservation funds.
2026 asphalt resurfacing changes
Costs $1,681,311.95, already in the annual road program budget.
US 421 / CR 200 South intersection safety
No county money involved — it's a support letter only.
Highway department job title change
Roughly $975,000 in new equipment, inspection, and construction commitments approved in one meeting.
Bridge inspection contracts for Bridges 285 and 229
Contract amounts to be considered at the meeting.
Highway bond appropriations for roads and bridges
Over $445,000 combined in design and inspection contracts, largely from bond funds.
300S/975E roundabout design agreement
About $280,000 of the $863,700 cost comes from local tax money; the rest is state and federal.
Countywide pavement data collection
Up to $41,580 for one year, from existing highway funds.
400 South/100 South roundabout change orders
Net effect: about $66,600 added to the roundabout contract after the subgrade change minus the lighting reduction.
2027 public transit grants and fleet replacement
The feds cover half the $809,455 operations cost and 85% of the vans; local/state match runs about $426,000 for operations and $21,300 for the vans.
Bridge 310 repair on Park Street
County's share is capped at $70,000 from bridge preservation funds.
Decisions during term (0)
Recorded while Plunkett was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.