Heflen Park septic system project
The new lift station pumps Heflin Park campground wastewater to Driftwood Utilities instead of an aging leach field, keeping all camp sites in service and even allowing the park to expand. The county gets about $6,200 back from unused contingency.
Driftwood Drain culvert failure on private drive
The contractor awarded the open ditch cleaning in 2024 never did the work and stopped responding. The board gave him until March 15, then plans to rebid for work this fall.
Chicken Creek drain assessment dispute and lawsuit settlement
Property owners have sued to challenge what the board approved in December. It's treated as routine litigation, but the county may need outside counsel and possibly an executive session.
Joseph Anthony Ditch maintenance
Full-length excavation, spoil hauling, and mowing on the ditch will be done by Wells Excavating, likely this fall or winter. Much of the line runs through yards and lawns, making it a tough job only one contractor bid on.
Petition for Brush Creek tributary jurisdiction
A petition asks the county to take over a roughly 3,000-foot neglected open ditch feeding Brush Creek near the Fisher and Cameron properties. An initial hearing is coming, and the initial work could fall on adjacent landowners.
DC Elliott Drain Phase Two reconstruction
Phase 1 was done six to eight years ago; Phase 2 is estimated around $50,000 and is the only remaining reconstruction the drain fund can afford. It's now at the top of the list with plans and bidding targeted for this fall.
Dinois Creek reconstruction permitting
A Bethel Village resident reported erosion on the drain creeping toward the county road. The board approved about $7,500 in repair work, but environmental permits for drains over 10 miles long mean it could take a year or more.
Blair Thompson addition detention drainage
Residents around the Blair Thompson Addition have dealt with standing water in a low-spot detention area for years — some recall water waist-deep and kids playing in it. A proposed 12-inch tile drain would lower the water level to within about a foot of emptying it, with costs to be assessed to benefited property owners at a later hearing.
Robert Finkel drainage litigation
The lawsuit over a drain remains in the judge's hands, with a hearing coming up soon the board need not formally participate in.
Walesboro Drain flooding and erosion
A homeowner on Jonesville Road has watched flooding worsen since industrial facilities and Southern Crossing went in, with her yard washing away and water backing up whenever the White River rises. The board says it can only stabilize the banks — it can't control river backwater or upstream volume.
Goldie Ann mobile home park sinkholes
The park's owner faces sinkholes and a threatened holding tank from a failing private clay tile the county says isn't a county drain — leaving him to fix it with the upstream landowner or risk backing water onto neighbors.
Clifford Line B extension maintenance funding
The 2021 extension was built without its own maintenance assessment; the board wants it folded into the Clifford drain so future maintenance can be paid from that fund, with no new charges to property owners. A public hearing is being planned for August.
Cook & Lehman tile reconstruction — cost and possible abandonment
A seven-mile, century-old 8-inch tile can't handle modern farm drainage, and fixing it could cost around $750,000 — money the drain fund doesn't have. Area landowners hired an attorney to fight the project in 2013, and the board is now weighing whether to abandon the drain instead. Decision deferred to next month's full board.