Civic Issues
Topics getting the most attention in Bartholomew County public meetings, ranked by how frequently they are discussed.
9 issues in parks rec with high priority
Petersville park activity concerns
Board members found dozens of discarded needles near the Petersville shelter house and asked the sheriff's department to add routine patrols. Camera deterrents were discussed, though commissioners have resisted cameras at parks.
BMX track expansion at Dunn Stadium
The BMX track opens April 11 after rain delays. A state-installed culvert set too high years ago is backing up drainage; fixing it is the gate to a hoped-for track expansion with new berms.
Humane Society Funding Restructure
The county's animal control costs have jumped from $90,000 five years ago to roughly $250,000 budgeted this year, driven partly by abandoned animals. The new five-year contract locks in a flat $100,000 base fee, and commissioners are banking on a new low-cost spay/neuter program to bring numbers down.
Covered Bridge Maintenance Funding
Commissioners praised the highway engineer's long-range bridge planning and discussed whether the Cumulative Bridge tax rate should be raised — commissioners would initiate it and council would have to approve. The county has the lowest rate around except Brown County, and the Flat Rock River bridge remains closed.
Anderson Falls restroom grant deferred to 2028
Chuck Wells is pushing to replace the primitive pit toilets at Anderson Falls with a proper modern restroom, asking for cost estimates now rather than waiting for the master plan.
Broken Gator at Heflen Park
The utility vehicle camp hosts depend on for daily operations died mid-season, and the board wanted it looked at by a real mechanic rather than patched in-house. Commissioners have now approved trading it in on a new one.
ADA accessibility in county parks
The new master plan flagged parking lots, signage and campsites county-wide as ADA trouble spots. Two accessible campsites at Heflin Park are a must-do this fall, funded from this year's budget.
Dunn Stadium turf replacement costs
Staff built their own temporary outfield fences from PVC, saving about $6,000 per field. A full infield turf project is estimated at about $1 million installed, and irrigation review comes in April — items headed for budget season.
Parks Master Plan and Funding Strategy
The draft plan says residents overwhelmingly want existing parks fixed up first — 91% support infrastructure improvements, 88% restrooms, 79% playgrounds. It also flags chronic underfunding: about $8 per resident versus a $33 national median, with just two full-time staff for 13 parks and 160 acres.