Civic Issues
Topics getting the most attention in Avon public meetings, ranked by how frequently they are discussed.
20 issues in development
Reserve at Shiloh Creek Section 2 subdivision
A proposed 52-lot subdivision on 27 acres along County Road 1050 East would add new homes and traffic in the area. The developer is also asking for a waiver to allow intersections closer together, which staff and commissioners will scrutinize.
Shared parking dispute at Shiloh Crossing (Nirvana Sports)
A large indoor recreation building — around 15,000 square feet — is proposed, along with one waiver of development standards and three waivers of design standards. The waivers are the key question for commissioners.
Satori Pointe Block B and Shops
Two linked requests from BRG Properties: a plat splitting 3.13 acres into two lots, and two new retail buildings totaling about 13,400 square feet. Together they shape what gets built at this commercial site.
Beechwood Soda Shop drive-through restaurant
A family-run 'dirty soda' and seasoned fries business wins approval to build an 825-square-foot drive-through on a long-vacant leftover lot in Beechwood Centre, dedicating 30 feet of right-of-way for a future connector road. Construction is expected to start immediately with opening in Q2 2027.
Grand Properties Mixed-Use Development on CR 100 South
A proposed development at 100 South and Ronald Reagan Parkway would bring four industrial flex buildings, about 60,000 square feet total, plus a marketplace with a fuel station. The council gave informal feedback but the rezoning still goes through the planning commission.
7-Brew drive-thru comes to Shiloh Crossing
A second 7-Brew coffee shop is cleared to build at US 36 and Shiloh Crossing, using parking on the neighboring lot under a recorded agreement. Permits wait until that agreement is signed and sidewalk easements are recorded.
Civic Center Project IT Equipment
Phones, docks, and monitors were approved for the Civic Center project as it moves toward completion.
Fisher Homes Residential TIF Request
A landlocked southeast parcel needs a roughly $1 million stream crossing before 25 homes ($800K-$1M each) can be built. Fisher Homes wants a residential TIF — the developer would buy the bond, so the town says it's at zero risk — to pay for the bridge only.
Southwest Quadrant Area Plan
A homebuilder wants to buy and develop part of the undeveloped southwest quadrant. Staff want a consultant-led area plan first, so the town — not a developer — decides where roads and land uses go across roughly 600 acres with just three landowners.
Misty Eyes Animal Center parking lot paving and expansion
After years of delays, the animal shelter on Dan Jones Road can pave its gravel lot and expand parking, satisfying a condition dating to its 2018 approval. Commissioners debated whether the operation is effectively commercial on residentially zoned land, but the use variance governs.
Lennar Series 2026B Bonds for Easton Gray
The town is setting up up to $5.35 million in developer-purchased bonds to pay for roads, sidewalks and utilities in phase two of the Lennar development. No tax burden falls directly on residents since the developer buys the bonds.
Avon Logistics TIF Bond No. 2 for Chicago Industrial
Chicago Industrial wants the town to support a $9.5 million TIF bond to build roads serving its next buildings at Avon Logistics — including a back road that would connect the whole park and help divert traffic off Rockville-area streets. The developer buys the bonds and gets repaid from TIF revenue, not town taxes.
Fairwood Section 5 subdivision
D.R. Horton is adding nine single-family lots to the existing Fairwood subdivision, temporarily relying on two entrances because the Bradford Road extension is still years out. The town gains ~5.9 acres of deeded floodplain land for future parks and a trail connection.
New state affordable housing mandate (HEA 1001)
By year's end the town must hold a public hearing on nine affordable-housing strategies and submit a detailed annual housing report to the state — likely requiring a consultant and constraints on building fees.
Large industrial building next to Sun Chase subdivision
A 613,714-square-foot logistics building is coming to the Avon Logistics Center, right against the Sun Chase neighborhood. The developer kept existing trees, added a four-foot mound with native, bee-and-butterfly-friendly plantings, and preserved woods to screen homes from the warehouse.
New developable lot at Shiloh Crossing
A 2.8-acre parcel across from Target is being split so a new commercial lot can be developed — preliminary talks suggest a business that may need a special exception, possibly a drive-through on US 36.
Avon Landing Building 3 industrial development
A 156,400-square-foot speculative warehouse is headed for the last big empty lot in the Avon Landing park at Ronald Reagan Parkway and Logistics Way. It fills a long-vacant parcel zoned for industry, with waivers granted to fit a warehouse into standards originally written for office-style buildings.
Civic Center construction progress
The joint town-school Civic Center is 46% complete, on budget at $36M, and on track to open in November. Contingency spending (~$300K of $3.3M used) and the entry mural design are the open items.
Performance Bond Releases for Completed Subdivisions
The town released over $1.5 million in performance bonds for Welford at Easton Grey Sections 1 & 2 and bonds for Countryside Crossing after inspectors confirmed the developers finished curbs, paving, signage, drainage and other required work. Maintenance bonds must still be posted.
Mo' Bettahs drive-through at former Swenson's site on U.S. 36
A Hawaiian restaurant, Mo' Bettahs, is moving into the old Swensons building — reportedly the first location of its kind in Indiana — and is working through the Plan Commission.