Steve Bailey
No biography on file yet.
Voice
- Meetings spoken in
- 24
- Total speaking time
- 3:23:56
- Avg per meeting
- 8:30
- Segments
- 3845
Want every word Bailey has said?
The OpenCity MCP for Claude.ai answers questions like “what has Bailey said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (20)
Justice Center project
The full cost estimate lands November 18 — expect the number to move as items get value-engineered out.
Bridge load posting and Bridge 142 progress
The project came in well under the bid price, saving county highway dollars.
Carnegie Building return to library
Avoiding demolition saves taxpayers an estimated $100,000 or more, though the county plans to keep the roughly nine acres of surrounding farm ground.
Golden Meadows property disposition
The county would likely transfer the building at no charge, while retaining surrounding farmland that generates cash rent.
2027 county health plan networks
Expected claims costs fall about $23,000 despite a difficult stop-loss market.
Local Road Safety Plan and county road safety
Funding decisions deferred until the plan is acted on.
Bridge 142 and log jam removal
About $431,322 in county bridge repair spending.
Flock safety cameras opposition
The Flock contract runs another two years and can be cancelled; no cost figures were discussed.
Countywide watershed study (Christopher Burke project)
Cost unknown but expected to be significant — the engineer recently did a similar 40-watershed study in Johnson County — and funding is still being figured out.
Countywide watershed study (Christopher Burke, Phases 1 and 2)
The planning work is grant-funded, and a completed plan could unlock additional grants for the county.
Additional Appropriations and Salary Ordinances
Salary ordinance amendments change county payroll spending, which comes from the county budget.
Jail bond refinancing
Frees up roughly $220,000 a year in cash flow; small negative present-value savings right now.
Courthouse stairway closure and Justice Center east entrance
Repairs were originally part of the judicial center project and are being pulled forward.
Jail medical and maintenance funding shortfalls
$159,175 for water heaters from the Cumulative Jail Fund plus about $19,200 in soffit repairs from the sheriff's maintenance fund.
2027 brush spray program
Generic Crossbow from Lehman's runs $43.50 a gallon versus $50.50 for name-brand at Everett's — a real savings for landowners clearing ditches.
Maggie Miller tile reconstruction (Blue Creek watershed)
Up to $6,000 from a system with about $61,185.
Golden Meadows building disposal
An auction would return the property to the tax rolls and end county maintenance costs.
2027 budget workshop and salary guidance
Sets the ceiling for next year's department budgets; fuel costs could force supplemental appropriations.
Rooster Ditch cleanup delay
The Rooster Ditch account shows about $24,000 available for the work.
Building variances near legal drains
No cost to the county; the landowner funds the building.
Decisions during term (732)
Recorded while Bailey was in office — not necessarily decisions they moved, spoke to, or voted on.