Northside Regional Lift Station Expansion

Crews will take soil borings at multiple locations through September 16 for the North Side Regional Lift Station and Force Main upgrade, one lane closure at a time.

7 mentions (1 this month)Last discussed Nov 17, 2026
HighWater Utilities

Wastewater System Development Charge

New sewer connections will pay $2,500 to $400,000 depending on meter size, replacing the old flat $400 tap fee, with money going to infrastructure. Builders say they understand the need after staff meetings but worry about housing costs; the Indiana Apartment Association opposes it.

13 mentions (1 this month)Last discussed Nov 2, 2026
HighWater Utilities

Sewer Rate Increases and $85 Million Wastewater Expansion

Sewer bills rise 2% a year for four years, and the city is bonding up to ~$85 million — financed partly at a low 2.87% state rate — to expand the wastewater plant's capacity from 10.5 to 15 million gallons a day. The bonds don't add new rate increases thanks to SK hynix grant funds and growth.

6 mentionsLast discussed Oct 5, 2026
HighWater Utilities

Wastewater utility finances and future rate increase

The 2025 utility report shows solid finances and a likely request later this year for another 2% inflationary increase — under $1 a month for the average customer. Sanitation fees are running short, prompting a review of routing and billing alternatives. The average residential bill is about $48 a month.

2 mentionsLast discussed Sep 29, 2026
HighWater Utilities

Wastewater Treatment Plant Modernization and Expansion

The big wastewater plant expansion is about two weeks behind on design — 90% drawings expected mid-July, which kicks off state permit review and the contractor's guaranteed maximum price. The new admin/lab building is also stalled waiting for piling equipment after crews hit old concrete dumped at the site decades ago.

3 mentionsLast discussed Sep 29, 2026
HighWater Utilities

Sewer lining near Soldiers Home Road

The city is lining a 24-inch sewer through a nature preserve before it collapses, avoiding a far more destructive open-cut repair.

2 mentionsLast discussed Sep 15, 2026
HighWater Utilities

Wastewater utility plant expansion progress

The council authorized build-operate-transfer procurement for the main wastewater treatment plant expansion — a major infrastructure project using the same method as the last facility expansion.

2 mentionsLast discussed Aug 11, 2026
HighWater Utilities

Wastewater plant electrical breaker repair

The main breaker that distributes all incoming power at the wastewater plant is faulty, so the city is renting a replacement while the original goes to Eaton for refurbishment — keeping the plant running without interruption.

1 mentionLast discussed Jun 23, 2026
HighWater Utilities

Northwestern Heights Sewer Lateral Repairs

Seven sanitary laterals run through a 24-inch storm line in Northwestern Heights, and the clay-to-ductile connections are leaking into the storm sewer. Cured-in-place lining contractors will be sought to fix it quickly.