NI

Nick Iaccarino

County Council Member, District 32024-01-01–2026-12-01; month-level start: January 2024 per WNIN (party caucus chose him to take the District 3 seat when Stephanie Terry was sworn in as mayor on New Year's Day); month-level end: December 2026 per his BallotReady profile

No biography on file yet.

At a glance

News mentions
0

Term ending Dec 1, 2026.

Voice

Meetings spoken in
1
Total speaking time
0:12
Avg per meeting
0:12
Segments
6

Want every word Iaccarino has said?

The OpenCity MCP for Claude.ai answers questions like “what has Iaccarino said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Water Utilities

Top issues during term (13)(Water Utilities)

high↑Nov 2026[23]

Greenbriar and Carrington Drive storm sewer projects

Greenbriar bids run about $125,000 to $151,000; Carrington bids from about $25,700 to $43,000.

medium↓May 2026[8]

Mark Norman Obstruction Petition Progress

Property owners bear removal costs; county-contracted removal would be bid out if they fail.

medium↓Aug 2026[6]

CenterPoint electric rates and the TDSIC mechanism

Residents face rising electric and gas bills tied to utility infrastructure charges.

high↓Sep 2026[6]

Greenborough Drive drainage and flooding

Cost of the right-of-way pipe design not yet estimated; county has traditionally not paid for pipes off the right of way.

medium↓Sep 2026[5]

Berry Drive Storm Sewer Inspection

Paid from the highway department's contractual funds within the normal budget.

medium↓Sep 2026[5]

Green River Road ditch obstruction dispute

high↓Apr 2026[3]

Charlotte Avenue pipe replacement

Repair costs will require contract bidding, and responsibility for pipes outside the right-of-way remains unresolved.

medium↓Jun 2026[2]

US Army Corps of Engineers Unresponsive on Creek Work

high↓Feb 2026[1]

Unannounced 5G Pole in Deerfield Estates

Residents fear the pole could knock down property values on affected lots and surrounding homes.

high↓Apr 2026[1]

Stormwater Drainage Failures and Old Subdivision Pipes

Repair costs will require contract bidding, and responsibility for pipes outside the right-of-way remains unresolved.

medium↓Mar 2026[1]

Drainage obstruction petition — Churchill Court

Remediation costs could later be apportioned among benefited parcels, potentially becoming tax liens if unpaid.

medium↓Feb 2026[1]

Verizon Small-Cell Rollout Countywide

No direct county cost, though residents fear broader aesthetic and property-value effects.

high↓Mar 2026[1]

Poet Square detention basin dispute

Fixing the basin could mean doubling the lake's size or lowering the outlet pipe — costs unresolved.

Decisions during term (0)

Recorded while Iaccarino was in office — not necessarily decisions they moved, spoke to, or voted on.

No decisions found matching Water Utilities.

Voting record (0)(Water Utilities)

No votes found matching Water Utilities.