JE

Justin Elpers

County Commissioner, District 2 (President)2023-01-01–2026-12-01; month-level start: January 2023 per the county commissioners page (four-year terms; District 1 and 3 elected in presidential years, District 2 in mid-term years) (District 2 was last elected in the mid-term cycle; no seating document found, start derived from the cycle); month-level end: December 2026 per the same page

About

Justin Elpers's platform focuses heavily on local infrastructure needs, specifically prioritizing road improvements to accommodate growth in areas like McCutchanville. Additionally, his campaign addresses community values and local governance as part of the Vanderburgh County Commissioner race.

Campaign promises (1)

  • infrastructure
    Prioritize infrastructure and road improvements in the fast-growing McCutchanville area.

At a glance

News mentions
0

Term ending Dec 1, 2026.

Voice

Meetings spoken in
21
Total speaking time
2:58:28
Avg per meeting
8:30
Segments
3550

Want every word Elpers has said?

The OpenCity MCP for Claude.ai answers questions like “what has Elpers said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Water Utilities

Top issues during term (13)(Water Utilities)

high↑Nov 2026[23]

Greenbriar and Carrington Drive storm sewer projects

Greenbriar bids run about $125,000 to $151,000; Carrington bids from about $25,700 to $43,000.

medium↓May 2026[8]

Mark Norman Obstruction Petition Progress

Property owners bear removal costs; county-contracted removal would be bid out if they fail.

medium↓Aug 2026[6]

CenterPoint electric rates and the TDSIC mechanism

Residents face rising electric and gas bills tied to utility infrastructure charges.

high↓Sep 2026[6]

Greenborough Drive drainage and flooding

Cost of the right-of-way pipe design not yet estimated; county has traditionally not paid for pipes off the right of way.

medium↓Sep 2026[5]

Berry Drive Storm Sewer Inspection

Paid from the highway department's contractual funds within the normal budget.

medium↓Sep 2026[5]

Green River Road ditch obstruction dispute

high↓Apr 2026[3]

Charlotte Avenue pipe replacement

Repair costs will require contract bidding, and responsibility for pipes outside the right-of-way remains unresolved.

medium↓Jun 2026[2]

US Army Corps of Engineers Unresponsive on Creek Work

high↓Feb 2026[1]

Unannounced 5G Pole in Deerfield Estates

Residents fear the pole could knock down property values on affected lots and surrounding homes.

high↓Apr 2026[1]

Stormwater Drainage Failures and Old Subdivision Pipes

Repair costs will require contract bidding, and responsibility for pipes outside the right-of-way remains unresolved.

medium↓Mar 2026[1]

Drainage obstruction petition — Churchill Court

Remediation costs could later be apportioned among benefited parcels, potentially becoming tax liens if unpaid.

medium↓Feb 2026[1]

Verizon Small-Cell Rollout Countywide

No direct county cost, though residents fear broader aesthetic and property-value effects.

high↓Mar 2026[1]

Poet Square detention basin dispute

Fixing the basin could mean doubling the lake's size or lowering the outlet pipe — costs unresolved.

Decisions during term (0)

Recorded while Elpers was in office — not necessarily decisions they moved, spoke to, or voted on.

No decisions found matching Water Utilities.

Voting record (0)(Water Utilities)

No votes found matching Water Utilities.