Top issues during term (20)(Roads)
2027-1 Community Crossings and paving
Both bids run roughly $300,000 over the engineer's estimate.
Multi-use trail expansion (TOD to downtown; Silhavy at CN tracks)
About $4 million, largely covered by federal highway funding.
2026 Local Streets Paving Program
Brings total local paving funds to about $5.36 million, using up all remaining trash fee revenue.
Jessee-Pifer neighborhood sidewalks and 2026 sidewalk program
Roughly $1 million combined in sidewalk construction, potentially coming in under estimates.
Lincolnway street closure
Stormwater, water main, and street improvement projects
$2.5 million reimbursable grant plus $2.5 million 0% loan for lead service line work.
Lincolnway–Campbell Roundabout Right-of-Way
Property owners will be compensated through the condemnation process; the roundabout itself is a major capital project.
Joliet Road Closure
2026-1 Community Crossings road improvements
$896,000 in grant money offsets a roughly $2 million road package; the city's $1.1 million share comes from local paving funds.
Institute St road improvements change order
Bid costs not yet determined; project will be publicly advertised for bids.
2026 Crack Seal Program
Not yet determined — bids haven't been sought.
Montdale Park Road Reconstruction
About $2.3 million, paid by the Redevelopment Commission rather than the general budget.
Froberg Road closures for sidewalk project
$364,500 in grant funds for the pathway.
US 30 & Silhavy Roundabout Cost Increase
Adds $76,255.76 to the roundabout contract.
Pepper Creek private street dedication
City reimburses 25% of the HOA's repaving cost and takes on maintenance of about 3,700 feet of road.
Citywide Safety Action Plan
Funded in part by a federal SS4A grant; will guide how future street and sidewalk budgets are spent.
Montdale Drive reconstruction
$2,473,195.59, funded from the commission's existing budget.
Calumet Avenue closure for striping and pedestrian safety work
Nearly $929,000 in sidewalk contracts, both under engineering estimates.
Dash Service Federal Funding Renewal
About $549,000 in federal money flowing to keep the Dash bus service running.
Flint Lake Garden Terrace Street Closure
Decisions during term (0)
Recorded while Anderson was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.
Voting record (0)(Roads)
No votes found matching Roads.