Jon Costas
No biography on file yet.
Voice
- Meetings spoken in
- 35
- Total speaking time
- 4:34:24
- Avg per meeting
- 7:50
- Segments
- 6144
Want every word Costas has said?
The OpenCity MCP for Claude.ai answers questions like “what has Costas said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (16)(Water Utilities)
Waterworks Revenue Bonds for new wells and transmission main
No rate increase from this borrowing; your average water bill is about $37/month now and stays on a previously planned path to about $43 by 2028.
Water system replacement wells
VCU has spent $33 million on water infrastructure over the past decade, with well bores costing $20,000-$30,000 each.
Franklin Street Improvements (2027)
Estimated $1.9 million total, split between water main, storm sewer, and roadway work.
NIPSCO labor lockout affecting Valparaiso residents
Eastside Water Well
VCU has invested about $33 million in water infrastructure over 13 years, with the wells improving system redundancy.
Weston Street storm sewer separation
$2.2 million project, with $959,000 covered by a federal grant.
Free V-Line service during storm recovery
Small revenue loss to the transit system while fares are suspended.
Utility board actions
$16,024 conversion plus a $27,670 change order.
Industrial wastewater discharge rules update
Penalties for violations run up to $2,500 first offense and $7,500 for repeat violations under Indiana Code.
Vale School Addition Water Service
Transportation Office Fiber Upgrade
About $8 more per month versus the existing Comcast circuit.
Heritage Valley Lift Station pipe replacement
$52,680 for the pipe replacement.
Stormwater Improvements on Lois Dr, Central Ave, Evergreen Dr
Lowest bid is about $45,000 over the city's estimate.
VLACD Conservancy District litigation and VCU intervention
A full feasibility assessment could cost well into six figures — roughly a quarter-million dollars based on the 2019 Damon Run review.
Lead service line replacement funding
$7.7 million requested; no rate increases expected even if fully financed as loans.
ValpoNet Repair Proposal
Repair costs and increased contractor fees associated with fiber restoration.
Decisions during term (0)
Recorded while Costas was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Water Utilities.