JC

Jon Costas

MayorJanuary 2024 – December 2027 (month-level start: January 2024 per Lakeshore Public Media 2023-11-07 - Costas won the Nov 2023 mayoral race and 2024-01-08 council minutes - Mayor Costas presiding; statute text unavailable; month-level end: December 2027 per four-year term; city mayor page confirms 2023 election; statute text unavailable)

No biography on file yet.

At a glance

News mentions
0

Term ending Dec 1, 2027.

Voice

Meetings spoken in
35
Total speaking time
4:34:24
Avg per meeting
7:50
Segments
6144

Want every word Costas has said?

The OpenCity MCP for Claude.ai answers questions like “what has Costas said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Water Utilities

Top issues during term (16)(Water Utilities)

high↓May 2026[12]

Waterworks Revenue Bonds for new wells and transmission main

No rate increase from this borrowing; your average water bill is about $37/month now and stays on a previously planned path to about $43 by 2028.

high↑Apr 2026[11]

Water system replacement wells

VCU has spent $33 million on water infrastructure over the past decade, with well bores costing $20,000-$30,000 each.

medium↑Oct 2026[10]

Franklin Street Improvements (2027)

Estimated $1.9 million total, split between water main, storm sewer, and roadway work.

medium↓Apr 2026[6]

NIPSCO labor lockout affecting Valparaiso residents

high↓Oct 2026[5]

Eastside Water Well

VCU has invested about $33 million in water infrastructure over 13 years, with the wells improving system redundancy.

medium↓May 2026[3]

Weston Street storm sewer separation

$2.2 million project, with $959,000 covered by a federal grant.

high↓Aug 2026[2]

Free V-Line service during storm recovery

Small revenue loss to the transit system while fares are suspended.

low↓Jul 2026[2]

Utility board actions

$16,024 conversion plus a $27,670 change order.

medium↓Jan 2026[1]

Industrial wastewater discharge rules update

Penalties for violations run up to $2,500 first offense and $7,500 for repeat violations under Indiana Code.

low↓Mar 2026[1]

Vale School Addition Water Service

low↓Feb 2026[1]

Transportation Office Fiber Upgrade

About $8 more per month versus the existing Comcast circuit.

low↓Feb 2026[1]

Heritage Valley Lift Station pipe replacement

$52,680 for the pipe replacement.

high↓Mar 2026[1]

Stormwater Improvements on Lois Dr, Central Ave, Evergreen Dr

Lowest bid is about $45,000 over the city's estimate.

high↓Mar 2026[1]

VLACD Conservancy District litigation and VCU intervention

A full feasibility assessment could cost well into six figures — roughly a quarter-million dollars based on the 2019 Damon Run review.

high↓May 2026[1]

Lead service line replacement funding

$7.7 million requested; no rate increases expected even if fully financed as loans.

high↓Jan 2026[1]

ValpoNet Repair Proposal

Repair costs and increased contractor fees associated with fiber restoration.

Decisions during term (0)

Recorded while Costas was in office — not necessarily decisions they moved, spoke to, or voted on.

No decisions found matching Water Utilities.