Jessee-Pifer neighborhood sidewalks and 2026 sidewalk program
Two big sidewalk packages went out for bid: about 18,000 square feet of replacements (estimate $400,000) and new pathways along Froberg Road and 500 North (estimate $617,000). Concrete bids came in competitive; awards will be recommended at the next meeting.
Multi-use trail expansion (TOD to downtown; Silhavy at CN tracks)
A new 1,400-foot trail will connect downtown to the Transit Oriented District, funded mostly by federal highway money ($4 million total). Construction could start next spring after tree clearing in the winter.
Stormwater, water main, and street improvement projects
Big sewer separation and water main work coming to Franklin Street, plus a lead service line replacement project backed by $2.5 million in grant and $2.5 million in 0% loan money.
2027 Asphalt Rejuvenation Program
Twelve recently paved local streets will get a rejuvenator treatment meant to stretch pavement life by 5 to 7 years, at a cost of $106,311.
Lincolnway street closure
Lincolnway between Campbell and Weston will fully close for about two weeks starting around September 28 for storm sewer separation work. Commuters and downtown businesses should plan for detours.
Division Road improvements for Pratt truck traffic
Up to $2 million in early TIF revenue will front-load Division Road reconstruction for truck traffic, with an interlocal agreement with the county still to be negotiated on scope, timing, and cost sharing.
Institute St road improvements change order
City Utilities seeks bids to replace about 830 feet of aging 6-inch water main serving the Kirchoff Park and Parkview Elementary area, which has had seven main breaks — three in the last five years.
Madison Street closure
Madison Street near Family Express closes for up to two weeks starting September 8 while underground fuel tanks are replaced. Homeowners keep access from the north, and a detour is in place.
2026 Crack Seal Program
Crack sealing got rescoped down to $141,750 after a high sole bid, and three alley paving quotes were opened — Boyd Asphalt came in almost exactly at estimate. The alley award decision comes next meeting.
Montdale Drive reconstruction
The long-planned rebuild of Montdale Park Drive moved forward with a $2.47 million contract to Milestone Contractors — slightly over estimate on a single bid received during peak paving season.
Pepper Creek private street dedication
The city formally accepted roughly 3,700 linear feet of private streets at the Courtyards of Pepper Creek into its public road system. The HOA repaves first and the city covers 25% of that cost; landscaping and storm infrastructure stay with the HOA.
Froberg Road closures for sidewalk project
Sidewalk work starting April 20 will close stretches of Froberg Road in three phases on weekdays from 7 a.m. to 5 p.m., with one week's advance notice. The project will connect Regatta, Pepper Creek, Irongate, and future Midwood neighborhoods.
US 30 & Silhavy Roundabout Cost Increase
Old hotel foundations found during construction added $76,255.76 and four days to the roundabout project, paid from State Road 130 relinquishment funds.
Lincoln Highway garage parking reconfiguration
Link apartment resident spots move to covered lower floors and 63 public spots move to the open top deck, mostly to allow safe snow removal on the top level. The public can still park on three levels during weekday hours.
Calumet Avenue closure for striping and pedestrian safety work
Two sidewalk packages came in under engineering estimates — $332,363 for 28 streets and $596,285 for 500 North and Froberg pathways — meaning more sidewalks in 2026. Calumet Avenue will close for two months starting April 1 for reconstruction.
Hayes Leonard Pathway Gap
A 100-foot missing link in the Hayes Leonard Road pathway will be filled for $32,399, connecting a school-built segment to Flat Rock Road and creating a continuous route to US 30. Pedestrians and students get a safer, complete path.
US 30 Gateway Landscaping
The long-running US 30 landscaping project wrapped up with a final change order that actually saved the city $19,629.50. Mayor Costas says the goal is for visitors to know they've arrived in Valparaiso.
No-parking restrictions on Elmhurst and Calumet
Cars will no longer be able to park near corners on Elmhurst Avenue (where a new sidewalk narrowed the road) and on Calumet Avenue south of Elm, where parked cars block sight lines for crossing drivers. Residents along those blocks lose curbside parking but gain safer traffic flow.
O'Hare Airport Commuter Service from Transit Center
Epic Limo will use the north end of the Transit Center parking lot to launch a commuter shuttle to O'Hare Airport, starting with four routes. The mayor said residents regularly ask for consistent airport service.
Dash Service Federal Funding Renewal
A transfer of bus service operations was scheduled to come before the commission. This could affect how local transit is managed and who operates it.
Harrison Boulevard drainage, erosion and curb concerns
A Harrison Boulevard resident described three years of drainage and erosion problems, repeated waterline breaks, and vehicles hitting saturated shoulders, with a five-year wait based on PACER ratings. Staff agreed erosion control — not road rating — is the right lens and will build a citywide list of open-shoulder locations.
Corridor Access Mitigation Program
The city is exploring ways to improve safety and reduce traffic accidents along major commercial corridors by managing driveways and curb cuts. Officials discussed potentially creating a small business grant program to help cover unexpected landscaping and access changes.