MediumRoads

Jessee-Pifer neighborhood sidewalks and 2026 sidewalk program

Two big sidewalk packages went out for bid: about 18,000 square feet of replacements (estimate $400,000) and new pathways along Froberg Road and 500 North (estimate $617,000). Concrete bids came in competitive; awards will be recommended at the next meeting.

5 mentions (1 this month)Last discussed Nov 13, 2026
MediumRoads

Multi-use trail expansion (TOD to downtown; Silhavy at CN tracks)

A new 1,400-foot trail will connect downtown to the Transit Oriented District, funded mostly by federal highway money ($4 million total). Construction could start next spring after tree clearing in the winter.

5 mentions (1 this month)Last discussed Nov 13, 2026
MediumRoads

Stormwater, water main, and street improvement projects

Big sewer separation and water main work coming to Franklin Street, plus a lead service line replacement project backed by $2.5 million in grant and $2.5 million in 0% loan money.

2 mentions (1 this month)Last discussed Oct 26, 2026
MediumRoads

2027 Asphalt Rejuvenation Program

Twelve recently paved local streets will get a rejuvenator treatment meant to stretch pavement life by 5 to 7 years, at a cost of $106,311.

1 mention (1 this month)Last discussed Oct 23, 2026
MediumRoads

Lincolnway street closure

Lincolnway between Campbell and Weston will fully close for about two weeks starting around September 28 for storm sewer separation work. Commuters and downtown businesses should plan for detours.

3 mentionsLast discussed Oct 9, 2026
MediumRoads

Division Road improvements for Pratt truck traffic

Up to $2 million in early TIF revenue will front-load Division Road reconstruction for truck traffic, with an interlocal agreement with the county still to be negotiated on scope, timing, and cost sharing.

1 mentionLast discussed Oct 8, 2026
MediumRoads

Institute St road improvements change order

City Utilities seeks bids to replace about 830 feet of aging 6-inch water main serving the Kirchoff Park and Parkview Elementary area, which has had seven main breaks — three in the last five years.

2 mentionsLast discussed Sep 11, 2026
MediumRoads

Madison Street closure

Madison Street near Family Express closes for up to two weeks starting September 8 while underground fuel tanks are replaced. Homeowners keep access from the north, and a detour is in place.

1 mentionLast discussed Aug 28, 2026
MediumRoads

2026 Crack Seal Program

Crack sealing got rescoped down to $141,750 after a high sole bid, and three alley paving quotes were opened — Boyd Asphalt came in almost exactly at estimate. The alley award decision comes next meeting.

3 mentionsLast discussed Aug 14, 2026
MediumRoads

Montdale Drive reconstruction

The long-planned rebuild of Montdale Park Drive moved forward with a $2.47 million contract to Milestone Contractors — slightly over estimate on a single bid received during peak paving season.

1 mentionLast discussed Aug 13, 2026
MediumRoads

Pepper Creek private street dedication

The city formally accepted roughly 3,700 linear feet of private streets at the Courtyards of Pepper Creek into its public road system. The HOA repaves first and the city covers 25% of that cost; landscaping and storm infrastructure stay with the HOA.

1 mentionLast discussed Jul 24, 2026
MediumRoads

Froberg Road closures for sidewalk project

Sidewalk work starting April 20 will close stretches of Froberg Road in three phases on weekdays from 7 a.m. to 5 p.m., with one week's advance notice. The project will connect Regatta, Pepper Creek, Irongate, and future Midwood neighborhoods.

3 mentionsLast discussed Jun 26, 2026
MediumRoads

US 30 & Silhavy Roundabout Cost Increase

Old hotel foundations found during construction added $76,255.76 and four days to the roundabout project, paid from State Road 130 relinquishment funds.

1 mentionLast discussed Jun 12, 2026
MediumRoads

Lincoln Highway garage parking reconfiguration

Link apartment resident spots move to covered lower floors and 63 public spots move to the open top deck, mostly to allow safe snow removal on the top level. The public can still park on three levels during weekday hours.

1 mentionLast discussed May 14, 2026
MediumRoads

Calumet Avenue closure for striping and pedestrian safety work

Two sidewalk packages came in under engineering estimates — $332,363 for 28 streets and $596,285 for 500 North and Froberg pathways — meaning more sidewalks in 2026. Calumet Avenue will close for two months starting April 1 for reconstruction.

3 mentionsLast discussed May 11, 2026
MediumRoads

Hayes Leonard Pathway Gap

A 100-foot missing link in the Hayes Leonard Road pathway will be filled for $32,399, connecting a school-built segment to Flat Rock Road and creating a continuous route to US 30. Pedestrians and students get a safer, complete path.

1 mentionLast discussed May 8, 2026
MediumRoads

US 30 Gateway Landscaping

The long-running US 30 landscaping project wrapped up with a final change order that actually saved the city $19,629.50. Mayor Costas says the goal is for visitors to know they've arrived in Valparaiso.

1 mentionLast discussed May 8, 2026
MediumRoads

No-parking restrictions on Elmhurst and Calumet

Cars will no longer be able to park near corners on Elmhurst Avenue (where a new sidewalk narrowed the road) and on Calumet Avenue south of Elm, where parked cars block sight lines for crossing drivers. Residents along those blocks lose curbside parking but gain safer traffic flow.

1 mentionLast discussed Mar 27, 2026
MediumRoads

O'Hare Airport Commuter Service from Transit Center

Epic Limo will use the north end of the Transit Center parking lot to launch a commuter shuttle to O'Hare Airport, starting with four routes. The mayor said residents regularly ask for consistent airport service.

1 mentionLast discussed Mar 13, 2026
MediumRoads

Dash Service Federal Funding Renewal

A transfer of bus service operations was scheduled to come before the commission. This could affect how local transit is managed and who operates it.

2 mentionsLast discussed Mar 13, 2026
MediumRoads

Harrison Boulevard drainage, erosion and curb concerns

A Harrison Boulevard resident described three years of drainage and erosion problems, repeated waterline breaks, and vehicles hitting saturated shoulders, with a five-year wait based on PACER ratings. Staff agreed erosion control — not road rating — is the right lens and will build a citywide list of open-shoulder locations.

2 mentionsLast discussed Mar 9, 2026
MediumRoads

Corridor Access Mitigation Program

The city is exploring ways to improve safety and reduce traffic accidents along major commercial corridors by managing driveways and curb cuts. Officials discussed potentially creating a small business grant program to help cover unexpected landscaping and access changes.

1 mentionLast discussed Jan 8, 2026