Civic Issues
Topics getting the most attention in Terre Haute public meetings, ranked by how frequently they are discussed.
4 issues in roads
8th and Walnut traffic signal removal
With the signal dead and traffic far below warrant levels, the council made 8th Street the stopping street at Walnut. Members weighed pedestrian safety near the library against the $40,000–$60,000 cost of repairing a light the data says isn't needed.
Street department dump truck failure before winter
A 2016 plow truck's engine blew up, leaving the street department short for snow routes. Resolution 11 moves $100,000 in casino budget money for a replacement, with hopes of a $65,000 DieselWise grant reimbursement.
First Street corridor redesign concept (Rose-Hulman student project)
Engineering students pitched a redesign of First Street from Holman Drive to Fairbanks Park featuring a multi-use trail, a roundabout at Holman, stormwater infiltration basins, glow-in-the-dark path markings, community gardens, and event-friendly bollards. Council members loved it, and one noted upcoming sewer work under First Street could be the vehicle to actually fund and build it.
Park Avenue lift station and 13th Street overpass projects
The city's sewer system serves areas beyond city limits, and the Park Avenue lift station — 30 feet deep with a high water table — needs replacing after a nearby force main corroded and discharged sewage. The $4.5 million appropriation completes a project in the long-term control plan.