21 issues with medium priority
County Claims and Cash Flow
Commissioners were scheduled to approve more than $2.5 million in total claims, including a single $1.9 million out-of-cycle batch drawing on local income tax and wheel tax district funds. These payments fund county operations and infrastructure.
Comprehensive Zoning Ordinance Review
County leaders were scheduled to discuss hiring a consultant to update the zoning ordinance. That document governs what can be built where, so any overhaul could eventually affect landowners, builders, and neighborhoods countywide. This was a discussion item only.
Community Crossings grant denial
The county's repaving application for the Angola-to-Blake corridor was denied — no data flaws, just too many applicants. Commissioner Laughlin vented that the state funded other projects without traffic data while the county got 1.5 million a year before the program was paused.
Airport runway lighting replacement
A $219,000 federal grant will fund design of a full LED rebuild of the runway lighting system — beacon, signs, wind cones — equipment that's 25 to 45 years old with parts no longer available.
County Fee Schedule Overhaul (Ordinance No. 1075)
Birth certificates would rise to $15 and out-of-county record issuance would cost $20; the ordinance wasn't ready so the vote is delayed.
Rezone Z-26-02 on 450 West
The county's zoning rules haven't been updated since 2008. A consultant will help phase in a full overhaul, starting with the casino ordinance, paid from budgeted funds.
Elected official stipends and longevity pay debate
Council members wrestled with criticism over cutting stipends for incoming elected officials, ultimately restoring the $5,000 court stipends and the sheriff's outgoing pay level. The discussion touched on sending a message to the state about funding courts versus not shortchanging incoming officeholders.
County Terrorism Response Plan
EMA will apply for a NIPSCO safety grant (up to $5,000 for CPR/AED training) and a ~$68,000 state homeland security grant for cybersecurity redundancy, and can now collect donations through an Amazon wish list.
C.R. 27 resurfacing via Community Crossings grant
Storm delays pushed the 2026 road program back a week, but chip sealing is underway. The county will apply for Community Crossing grant funds to pave Old 27 from Angola to Pleasant Lake in 2027.
EMS billing performance and 2027 outlook
EMS billing collections are way up year over year, with 2026 projections at about $2.035 million — the first time ever over $2 million.
Outdoor Warning Siren Maintenance Costs
The Clear Lake and Silver Lake tornado sirens are getting repaired for $2,847, with the director shuffling budget lines to cover it.
Split of Building and Planning departments
The county is separating its combined Building and Planning departments into a Building Commissioner and a Plan Director — same office space, cross-trained permitting staff, no new hires, but about $7,000 more in salary through year-end. Council members hope it speeds up permits and improves the county's reputation with builders.
Solid waste tub grinder replacement
The four-county solid waste district will spend $1.5 million on a new tub grinder that turns storm debris and yard waste into sellable mulch, recovering roughly half the cost by selling or trading its old machines.
ADA Transition Plan adoption
The county is leaving its Revize website for Tyler Indiana to meet upcoming state ADA website rules and get better security on a .in.gov domain — and at lower annual cost. A federal grant application to help pay is still pending.
Cybersecurity, cyber insurance and first AI policy
The county's updated incident response plan adds the EMA director as default incident manager, sets a 30-45 day after-incident review, and arranges secure device preservation in the Sheriff's evidence room.
Pleasant Lake Speed Limit and No-Parking Ordinance
Two new traffic ordinances got first-reading approval: a 35 mph limit on CR 475 S/1000 W and 20 mph/no-parking rules on Pleasant Lake streets residents requested. Two more readings are needed before they take effect.
Community Center roof repairs
Water is leaking into the Community Center through failed caulk joints in roof trim, causing bubbling. Repairs up to $7,500 approved and scheduled after September.
100 N / 200 W Roundabout Project
NIPSCO gas relocation at the roundabout finishes mid-June, then REMC and Frontier relocate utilities; the road won't close for actual construction until Spring 2027, when Brooks Construction gets up to 120 days.
Highway projects and 2027 budget
Progress on the roundabout, Poka-Bache trail right-of-way, chip seal and striping programs, plus a 2027 draft budget with no raises and no new full-time positions. Concerns remain about projected Fund 1176 revenue.
Unmaintained County Road 500 N right-of-way
A property owner asked about a crossing on a road the county hasn't maintained since the 1970s-80s and collects no tax revenue on. The county won't spend money on it; the related deed/assignment was tabled and may go to the Drainage Board because landlocked parcels depend on it.
Emergency disaster preparedness kits
EMA will solicit community donations to help residents build their own disaster kits, a project spearheaded by the office's summer intern.