Diane Macek
No biography on file yet.
Voice
- Meetings spoken in
- 3
- Total speaking time
- 0:54
- Avg per meeting
- 0:18
- Segments
- 22
Want every word Macek has said?
The OpenCity MCP for Claude.ai answers questions like “what has Macek said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (20)(Roads)
Bridge 9 property purchase
About $900,000 total, with possible federal help to avoid draining the bridge fund.
Community Crossing road grant
$385,605.60 in grant-funded road work.
Olean alleyway vacation dispute
The county will absorb survey, dedication, and chip-and-seal costs for roughly 300 feet of road.
Winter salt supply
Superload escorts on US 50
Damaged road surfaces — some on state roads the county can't control — could leave the county and landowners absorbing repair and safety costs.
CSX railroad crossing on State Road 25 East
Possible cost-sharing with CSX under review.
Kev Hill Bridge project
Cave Hill Road bridge will go into the 2026 budget cycle — cost not yet final.
Dangerous intersection at 1050 N and 350 W
Cost limited to signage; an engineering study, if pursued, could add expense.
Bridge steel costs and data center demand
Steel costs have roughly doubled, inflating the bridge project budget.
SR 46 closure detour and heavy-truck damage
Detour road repairs may be reimbursed through the CCMG grant; damage from heavy trucks could cost the county if not cited.
Road renamings for Captain William Burkett and Kenneth Knowlton
Signage costs for the renamed stretches, though not discussed in detail.
Chip-and-seal supply shortage
About $1.97 million of county road money goes to chip and seal this year.
Traffic safety on 450 South
Radar signs already purchased; children-at-play signs are a minimal highway cost.
200 East road extension
No cost to the county unless/until the road is accepted into the inventory.
Highway bridge foreman reclassification
$28,185 combined in transfer and appropriation from existing highway funds.
Bridge 180 ownership dispute (S.R. 25 East)
County isn't spending anything — the bridge stays closed instead.
Catch-A-Ride public transit service
Fares of $2-$3 for the first five miles, subsidized by a federal Section 5311 grant and local match.
2026 chip-and-seal program
Potential extra ~$2,000–$2,500 per mile if oil sealing is added.
Driveway permit fee proposal
$25 per permit would offset county inspection costs; fines for noncompliance discussed.
Mud Pike bridge collapse and 600 East/Mud Road signage
Bridge repairs are expected to be expensive but funded; no figure given.
Decisions during term (1)
Recorded while Macek was in office — not necessarily decisions they moved, spoke to, or voted on.
Voting record (0)(Roads)
No votes found matching Roads.