DT

David Tebbing

County Council Member, District 42023-01-01 to 2026-12-31 (term began 2023 and expires 2026 per county council page 'Term Began/Term Expires'; start January 1 and end December 31 per Ind. Code § 36-2-3-3 subsection b, 2016 compilation text read)

No biography on file yet.

At a glance

News mentions
0

Term ending Dec 31, 2026.

Voice

Meetings spoken in
1
Total speaking time
0:00
Avg per meeting
0:00
Segments
1

Want every word Tebbing has said?

The OpenCity MCP for Claude.ai answers questions like “what has Tebbing said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (20)(Roads)

high→Jan 2026[34]

Bridge 9 property purchase

About $900,000 total, with possible federal help to avoid draining the bridge fund.

high↑Aug 2026[15]

Community Crossing road grant

$385,605.60 in grant-funded road work.

high↓Jan 2026[11]

Olean alleyway vacation dispute

The county will absorb survey, dedication, and chip-and-seal costs for roughly 300 feet of road.

high↑Nov 2026[10]

Winter salt supply

high↑Oct 2026[10]

Superload escorts on US 50

Damaged road surfaces — some on state roads the county can't control — could leave the county and landowners absorbing repair and safety costs.

high↓Feb 2026[7]

CSX railroad crossing on State Road 25 East

Possible cost-sharing with CSX under review.

high↓Jan 2026[6]

Kev Hill Bridge project

Cave Hill Road bridge will go into the 2026 budget cycle — cost not yet final.

high↓Aug 2026[5]

Dangerous intersection at 1050 N and 350 W

Cost limited to signage; an engineering study, if pursued, could add expense.

medium↓Sep 2026[5]

Bridge steel costs and data center demand

Steel costs have roughly doubled, inflating the bridge project budget.

high↓Sep 2026[5]

SR 46 closure detour and heavy-truck damage

Detour road repairs may be reimbursed through the CCMG grant; damage from heavy trucks could cost the county if not cited.

low↓Jun 2026[4]

Road renamings for Captain William Burkett and Kenneth Knowlton

Signage costs for the renamed stretches, though not discussed in detail.

high↓Feb 2026[3]

Chip-and-seal supply shortage

About $1.97 million of county road money goes to chip and seal this year.

high↓Jun 2026[2]

Traffic safety on 450 South

Radar signs already purchased; children-at-play signs are a minimal highway cost.

medium↓Jul 2026[2]

200 East road extension

No cost to the county unless/until the road is accepted into the inventory.

low↓May 2026[1]

Highway bridge foreman reclassification

$28,185 combined in transfer and appropriation from existing highway funds.

medium↓Jan 2026[1]

Bridge 180 ownership dispute (S.R. 25 East)

County isn't spending anything — the bridge stays closed instead.

medium↓Mar 2026[1]

Catch-A-Ride public transit service

Fares of $2-$3 for the first five miles, subsidized by a federal Section 5311 grant and local match.

high↓Jan 2026[1]

2026 chip-and-seal program

Potential extra ~$2,000–$2,500 per mile if oil sealing is added.

medium↓Mar 2026[1]

Driveway permit fee proposal

$25 per permit would offset county inspection costs; fines for noncompliance discussed.

high↓Apr 2026[1]

Mud Pike bridge collapse and 600 East/Mud Road signage

Bridge repairs are expected to be expensive but funded; no figure given.

Decisions during term (1)

Recorded while Tebbing was in office — not necessarily decisions they moved, spoke to, or voted on.

Voting record (0)(Roads)

No votes found matching Roads.