20 issues in roads
Community Crossing road grant
About 8 miles remain in the north and 50 in the south to finish this year's chip and seal work.
Bridge 9 property purchase
The Cavehill Bridge replacement is now pegged at roughly $900,000 including permits, surveys, land and concrete. A federal funding lead through Rep. Erin Houchin's office could save the county's bridge fund.
Winter salt supply
The highway barn is low on salt and can't get a delivery date despite weekly calls; the county is mixing in sand and cinders to stretch supplies.
Superload escorts on US 50
Oversized 'superload' trucks escorted by out-of-town police agencies are tearing up state and local roads and creating safety hazards on US 50, with untrained escorts failing to properly stop traffic. The state's 46/129 routing rules and data-center construction traffic are driving the problem.
Olean alleyway vacation dispute
Sparked by a Dearborn County dispute, commissioners worry someone could use a 120-year-old road easement to cut across a neighbor's land for profit. Attorney John Ertel explained how vacated versus existing rights-of-way work; no action yet.
SR 46 closure detour and heavy-truck damage
State Road 46 will fully close for about 30 days next year, with traffic detoured down county roads 1300 N and 1000 N/Schneider Road. Commissioners worry trucks will wreck the rough county roads and want a temporary no-semi ordinance with penalties, modeled on Dearborn County's.
Bridge steel costs and data center demand
AI data center construction is driving steel prices up — the county's bridge steel quote jumped from $35,000 to $60,000 in months. Bridge bids open October 8 and work may not start until mid-2027.
Dangerous intersection at 1050 N and 350 W
After numerous complaints, the county will install a crossing sign and drop the speed limit to 30 mph; commissioners learned an engineering study may be needed to make the limit enforceable.
CSX railroad crossing on State Road 25 East
The highway department still can't get CSX to respond about the Bridge 25 East project, though research found the railroad paid half the cost of a prior bridge repair around 2003-04.
Kev Hill Bridge project
The 'singing bridge' on 1000 North closed for two days of welding and deck repairs; the bigger Cave Hill Road bridge replacement is being designed now with groundbreaking hoped for spring 2027.
200 East road extension
A landowner will extend 200 East 50 feet at his own cost to enable a property split and new house; the county takes over maintenance after one year if it meets specs.
Road renamings for Captain William Burkett and Kenneth Knowlton
Two Ripley County road stretches will be named for Vietnam veterans Captain William Burkett (US 50, CR 750 to Dearborn County line) and Kenneth Knowlton (State Road 350 near Old Mill Road), pending state legislative approval.
Traffic safety on 450 South
A resident says speeding trucks, concrete trucks and buggies near the S-Curve Greenhouse endanger children; the county will add children-at-play signs and consider radar speed signs before any stop signs.
Chip-and-seal supply shortage
Crews will chip and seal 209 miles this year at roughly $1.97 million. Some roads from last year are peeling, and the county is investigating why before repeating the mistake.
Highway bridge foreman reclassification
The Highway Department promoted a bridge crew member to foreman with a $24,919 transfer plus $3,266 appropriation — oversight officials say will protect the county on a roughly $12 million bridge project.
Mud Pike bridge collapse and 600 East/Mud Road signage
A bridge wall on Mud Pike collapsed and the road is shut down while engineers assess rotted pilings — repairs have funding but will be expensive. Separately, the county stopped maintaining a section of 600 East and posted warning signs; dead-end signs and possibly a barrier may follow.
2026 Chip-and-seal Program
Chip and seal starts May 4 on about 210 miles. Last year some roads failed because the work was rushed and the wrong oil was used — a refresher course from Asphalt Materials is planned for April.
Catch-A-Ride public transit service
Catch-A-Ride gave over 8,500 Ripley County trips in 2024. Fares start at $2-$3 for the first five miles, and anyone can ride for any purpose — not just seniors or medical trips.
Driveway permit fee proposal
The highway superintendent wants a $25 driveway permit fee to stop people from tossing undersized pipes in county ditches. The attorney will check existing ordinances; possible fines for noncompliance were also discussed.
Bridge 180 ownership dispute (S.R. 25 East)
CSX and its permitting consultant want $74,000 in permits plus $5,000 a day for a 60-day flagger before anything moves, so the bridge stays closed. The county can't even get CSX to say who owns it.