Ryan Riegsecker
No biography on file yet.
Want every word Riegsecker has said?
The OpenCity MCP for Claude.ai answers questions like “what has Riegsecker said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (16)(Water Utilities)
Barr Tile storm drain reconstruction in Topeka
Roughly half a million dollars in construction plus about $60,000 in engineering oversight.
Sarah Davis #5 rock intrusion at flea market
Another jetting could cost $5,000–$6,000, and a permanent fix will cost more; the board is weighing whether one entity should pay instead of the whole watershed.
Francis #9 crossing at SR 3 and INDOT cost-sharing
The county could be stuck with up to $123,000 of a $160,000 project if INDOT's position holds.
Fish/Royer Lake channel dredging
A small new assessment would hit watershed property owners after a February public hearing, since only $14,260 is on hand against an $80,000-$100,000 project.
Sewer Tap-In Fee Costs and Housing Affordability
Connecting a new home to the regional sewer district can cost roughly $27,000 before construction, a major hurdle for affordable housing.
Cochran ditch cleaning at Stroh on hold
Drainage discharge onto neighboring property
Potential future drainage complaints or washout repairs could fall on the neighboring property owner.
Wuthrich #215 funding shortfall
Cost unknown until a hearing sets an assessment on landowners in the watershed.
Yeager #134 drain repairs and INDOT reimbursement
County pays $100,000 up front, hoping to recoup about $45,000–$47,000 from INDOT.
Lakeside Park storm drain failure
Up to $6,000 from the county's drain cost-share fund.
Mirror Lake pond lowering
No dollar figure was given for the control-structure modification; work should be done within a few weeks.
Stormwater drainage at northern Indiana lakes
Builders will bear the cost of drainage tile, grading, and stormwater plans as permit conditions.
Commercial well and septic separation rules for farm operations
Drilling a new commercial well could cost the owner thousands of dollars if the existing house well can't be used.
Drainage right-of-way encroachment enforcement
Delays could cost the landowners time on their projects but no county dollars are at stake yet.
Adams Lake inlet maintenance funding
Cleaning will cost $22,500–$51,000; restarting the assessment fund means landowners in the watershed pay in again, likely in the year after the hearing.
Buck Creek reimbursement to Roy Miller
The county's drainage fund is out $8,485.88, but the board considers it money already owed.
Decisions during term (0)
Recorded while Riegsecker was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Water Utilities.