Sarah Davis #5 rock intrusion at flea market
The tile serving Mirror Lake and Shipshewana keeps filling with gravel from the flea market grounds, and the strainers installed to stop it were quietly removed. The county must pick a permanent fix and figure out whether the flea market should bear the cost.
Fish/Royer Lake channel dredging
The channel connecting Fish and Royer Lakes has silted to about two feet, making it hard for boaters to get through. Cleaning it could cost $80,000-$100,000, and only about $14,260 is in the account — so a maintenance fund with a small assessment on watershed property owners is being set up, with a February hearing likely.
Barr Tile storm drain reconstruction in Topeka
The Barr Tile acts more like Topeka's storm sewer than a farm drain, and a collapsed section still needs replacing — estimated around $500,000. The town is fixing road crossings, and the board must pick an engineering firm to oversee the rest, with only one proposal so far.
Francis #9 crossing at SR 3 and INDOT cost-sharing
INDOT wants to pay only $37,000 of the $160,000 crossing project while the county says the state's true share is the bigger number. If talks fail by November, the county will pursue a public hearing and assess INDOT its share.
Sewer Tap-In Fee Costs and Housing Affordability
A resident pointed out the regional sewer district charges up to $7,400 plus a roughly $20,000 grinder pump to connect a new home, while the Town of LaGrange charges just $250. He urged local officials to press the sewer district to lower tap-in fees. Members noted the county has no authority over the district's rates, and compared the costs to septic systems running $12,000-$30,000.
Cochran ditch cleaning at Stroh on hold
Cleaning of the Cochran ditch in Stroh is paused because water levels are running about a foot and a half above normal, making proper work impossible.
Wuthrich #215 funding shortfall
The Wuthrich #215 drain needs encapsulation across the road and upstream maintenance, but the assessment account has no money. A January 2027 public hearing will decide whether landowners pay into the fund for the work.
Lakeside Park storm drain failure
A 1952 clay tile drain that handles runoff for about a dozen Lakeside Park properties failed, flooding a well head and yards. The county will spend up to $6,000 to install a new drain along the Steuben County right-of-way, with Steuben County and landowners covering the rest.
Yeager #134 drain repairs and INDOT reimbursement
The county spent $100,000 fixing the Yeager #134 drain near Wolcottville, including jack-and-bore work under a state road. INDOT agreed to kick in roughly $45,000, but the county fronts the money and waits for reimbursement.
Drainage discharge onto neighboring property
One approved warehouse addition pipes a six-inch discharge right up to the property line — the commission only signed off after requiring the neighbor's written approval.
Mirror Lake pond lowering
Fourteen landowners around the Mirror Lake pond in Shipshewana petitioned the board after heavy rains sent water over their seawalls. The board approved augmenting the control structure to lower the pond 8-10 inches, though some worry the pond could run low in dry weather, and the town of Shipshewana didn't sign the petition.
Stormwater drainage at northern Indiana lakes
Drainage came up in three of five cases — roof runoff toward neighbors, driveway water near the floodplain, and required stormwater plans. Builders are being pushed to tile water to the lakes rather than across roads.
Commercial well and septic separation rules for farm operations
The Omer Miller bottle calf barn exposed a recurring wrinkle: a house well with a 50-foot radius can't just double as a commercial well, which needs 100 feet of separation from a septic system. Owners of farm sites need to plan well placement early.