Fieldstone Subdivision Roads
Fieldstone One's roads are failing and the original developer is gone, so the county agreed to let the new developer fix them now in exchange for accepting them for maintenance — avoiding a possible Barrett Law-style assessment on homeowners later.
Riverside Drive truck hauling permits
The city cleared a batch of right-of-way permits for construction and utility work in public rights-of-way, with a few applications held back for more information or pending site review.
2026 Mill and Overlay-Phase III Street Paving
The city is moving ahead with its second phase of 2026 street repaving. Two bids came in, with the lowest at about $201,134, and the Board took them under advisement before awarding a contract.
SR 66/Diamond Avenue Corridor Analysis
A new study will map out safety, capacity, walking/biking/transit, and placemaking improvements along Diamond Avenue. It sets the stage for future investments on one of Evansville's key corridors.
2026 Pavement Preservation Project
The city's annual street paving and maintenance program drew a single bid of $980,546.50 from Evergreen Road Works. The board held off on awarding it pending review, so repaving plans hang on the follow-up decision.
Tree and sidewalk conflicts
Root-lifted sidewalks keep forcing case-by-case fights between accessibility and tree preservation. A wheelchair user on Lincoln Avenue is currently detouring into the street, and the board wants a real policy — including trying to route sidewalks around trees and testing rubber sidewalk material — instead of defaulting to removal.
Speeding near Wesselman Park playground
Two residents and a parks officer described drivers — often tennis and pickleball players — speeding past the new playground, where toddlers step out of cars just 10 feet from the road. Police recommend speed bumps over feedback signs, and the department is exploring traffic-calming options.
County road paving via INDOT Community Crossings grant
A $558,222 contract will finally repave roads that haven't been touched since they were built, including sections near the University Parkway ramps, Hillside Terrace and 11th Avenue.
2026-2030 TIP amendments and modifications
Three safety projects on Franklin Street, John Street, and Diamond, Covert, and Lynch roads are being dropped from the federal funding program because they couldn't hit INDOT's timeline for getting money before construction letting. That means those safety fixes will need another funding path.
FY 2032 federal highway funding call for projects
The MPO is about to invite applications for federal highway money for projects that must be ready to bid between July and November 2031. Local governments need applications in by the first week of August.
2026 Mill and Overlay Paving Program
The city signed a $2 million contract to mill and overlay four road segments this year, with state grant money covering a share. Work was expedited because the grant required a signed contract by the next day.
University Parkway improvements for Old Farm development
The Old Farm development's parkway improvements were approved with a J-turn instead of a traffic signal — something westside Commissioner Goebel said he's glad to see. Dirt is already moving, though rain has slowed work.
Tree vs. sidewalk conflict policy
The city keeps hitting cases where tree roots destroy sidewalks, and there's no consistent rule for when a tree comes out. Staff are researching costs and other cities' approaches, with a case-by-case framework expected next month.
Bosse Avenue Road Embankment Repairs
A sliding embankment north of Claremont is causing a hole in Bosse Avenue. The board authorized seeking quotes for repairs.
2026 Street Resurfacing and Pavement Projects
The board was asked to let the city advertise for bids on the first phase of 2026 street resurfacing. This is the program that actually gets pothole-prone streets milled and repaved.
Free bus fare for seniors, disabled riders, and disabled veterans
METS is keeping its free-fare pilot for seniors and people with disabilities going, and adding disabled veterans with at least 10% VA disability. Riders verify eligibility and get a METS card.
Regional road project progress
Major projects are moving: Oak Hill Road widening is under construction, Epworth Road phases are advancing through right-of-way and permits, and SR 62/US 41 intersection work continues. Some construction, like the SR 62 Wabash Avenue segment, could start by August or September.
Removal of delayed City of Evansville safety projects from TIP
Three safety projects on Franklin Street, John Street, and Diamond, Covert, and Lynch roads are being dropped from the federal funding program because they couldn't hit INDOT's timeline for getting money before construction letting. That means those safety fixes will need another funding path.
Walnut Phase III project acceptance
The Walnut Phase III project got a paperwork fix with INDOT: 76 days of extension already granted for Milestone 1 now formally apply to Milestone 2 as well, at no additional cost.
Old Boonville Highway apartment traffic concerns
A 216-unit apartment development on 15.87 acres at 6600 Old Boonville Highway hinges on whether the narrow two-lane road can safely handle the added traffic. The developer's engineer found an auxiliary lane is warranted, but council members and neighbors worry a 'passing blister' isn't enough.
I-69 Ohio River Crossing funding
The MPO amended its transportation program to spell out how the bridge portion of the I-69 ORX project will be funded, using Kentucky highway funds and federal TIFIA money shared between the two states. It's a paperwork step, but it locks in the money trail for one of the region's biggest projects.
Oak Hill Road widening under construction
An interlocal agreement with the Evansville Water and Sewer Utility was scheduled for relocating water and sewer lines during the Oak Hill Road reconstruction between Lynch and St. George roads.
Oak Hill Road widening contract awarded
The Oak Hill Road widening project (Lynch Road to St. George Road) with bike and pedestrian accommodations went out for bid in January and the contract went to Blankenberger Brothers for about $9.7 million. Right-of-way clearing has started, so residents near the corridor will see construction activity ramping up.
Walnut Street project Change Order 15
The Walnut Street project, already the city's largest street reconstruction effort at roughly $21.8 million, was up for a change order adding a pedestrian and vehicular traffic study with INDOT. The addition costs $21,588.25.