Pedestrian Safety at Fowler Avenue & Wiggins Street
The commission is reviewing pedestrian safety at the intersection of Fowler Avenue and Wiggins Street to see if crosswalk or signal upgrades are needed. Safe crossings in this area are important for students and neighborhood residents navigating daily traffic.
Pedestrian crossing improvements citywide
The Street Department will upgrade rapid flashing beacons, replace a problematic school flasher system at Cumberland, and add radar speed signs that flash red and blue lights during school hours. Concerns about speeding near the Willis school crossing were a key driver.
425 Connector and Salisbury Roundabout
The closure of Salisbury between Kalberer and CR 500 includes replacing two big culverts over Boes Ditch — a protected waterway — and building a roundabout. Mayor Easter says it should reopen to north-south traffic around December 1, and power lines are being buried citywide as an ongoing effort.
CR 425 road construction delay
Several residents said the root problem is that County Road 425 was never built before the northern subdivisions expanded, leaving Westmoreland as the only route. The section now has no construction schedule.
Salisbury Street / County Road 425 Construction
The closure of Salisbury between Kalberer and CR 500 includes replacing two big culverts over Boes Ditch — a protected waterway — and building a roundabout. Mayor Easter says it should reopen to north-south traffic around December 1, and power lines are being buried citywide as an ongoing effort.
Amberleigh Village and Blackbird Farms resurfacing
Three neighborhoods get their streets resurfaced this year, with the state covering half the roughly $1.26 million bill through the Community Crossings Matching Grant. Blackbird Farms streets will also get milling and patching.
2026 Pavement Resurfacing Bids (Three Neighborhoods)
The city opened bids for resurfacing Amberleigh Village, Blackbird Farms, and Hills and Dales streets using a 50/50 state-local matching grant. Contracts will be awarded after review — Rieth-Riley was lowest on all three.
Westmoreland Drive speeding and construction traffic
Arbor Chase residents say heavy construction trucks and cut-through traffic make Westmoreland Drive unsafe for kids walking to school bus stops, and damage the road. The city's data shows high volume but mostly compliant speeds; more study is planned.
Hills and Dales resurfacing closures
Hills and Dales neighborhood streets will be closed weekdays August 3-21 for milling, patching, and paving. Local access stays open, but short driveway-front closures are possible.
ADA Sidewalk Panel Replacements
Chairman Bossung described watching three people fall on broken sidewalks near Purdue basketball games, pushing for more sidewalk funding. Sidewalks are legally the property owner's responsibility, which complicates repairs, and projects outside low-income zones lose CDBG eligibility.
Northwestern Avenue road deterioration (Stadium to Dodge)
A resident spotlighted the crumbling stretch of Northwestern Avenue between Stadium and Dodge, saying the city says there's no money to fix it. Officials said engineering is investigating causes and costs, with a temporary fix — possibly an underground bridge at the stadium curve — planned for this fall and a long-term fix a year to a year and a half out.
Northwestern Avenue Emergency Road Repairs
A rough section of northbound Northwestern Avenue between Evergreen and Dodge is getting a $40,656 temporary patch while engineers figure out the root cause of the pavement failure. The fix is expected to hold a year or more; paving happens July 27-28 while students are away.
SK hynix construction traffic management
The chip fab project is redistributing worker parking across three sites and adding smart temporary signals to keep Yeager Road moving. Peak construction traffic could triple current volumes on Yeager, and cyclists are already concerned about safety and blocked paths.
Hills and Dales neighborhood parking
The city is studying parking across neighborhoods, starting with Hills and Dales. Mayor Easter has told staff to hold off on installing the signs while engineers and the building commissioner talk with neighbors and public safety officials about traffic and emergency vehicle access.
County Road 425 North Connector
The city and county will jointly build signals, roads and bridges along CR 425 North using a Build Operate Transfer contract. It became urgent because the Arbor Chase expansion needs a second entrance for fire and EMS access, but residents worry about truck traffic, narrow curbs on Millington Trail, and a hidden plan to industrialize CR 500.