Top issues during term (20)(Roads)
2027-1 Community Crossings and paving
Both bids run roughly $300,000 over the engineer's estimate.
Multi-use trail expansion (TOD to downtown; Silhavy at CN tracks)
About $4 million, largely covered by federal highway funding.
2026 Local Streets Paving Program
Brings total local paving funds to about $5.36 million, using up all remaining trash fee revenue.
Jessee-Pifer neighborhood sidewalks and 2026 sidewalk program
Roughly $1 million combined in sidewalk construction, potentially coming in under estimates.
Lincolnway street closure
Lincolnway–Campbell Roundabout Right-of-Way
Property owners will be compensated through the condemnation process; the roundabout itself is a major capital project.
Joliet Road Closure
Stormwater, water main, and street improvement projects
$2.5 million reimbursable grant plus $2.5 million 0% loan for lead service line work.
2027 Asphalt Rejuvenation Program
Costs $106,311, funded from paving dollars.
G&L Superload Hauls Through City Streets
G&L will provide bonds as insurance for potential infrastructure damage; unknown city cost otherwise.
Snow removal contract for LHG
Unknown — the proposal's cost was not included in the materials provided.
Mound Street closure
2026-1 Community Crossings road improvements
$896,000 in grant money offsets a roughly $2 million road package; the city's $1.1 million share comes from local paving funds.
Montdale Park Road Reconstruction
About $2.3 million, paid by the Redevelopment Commission rather than the general budget.
2026 Crack Seal Program
Not yet determined — bids haven't been sought.
Institute St road improvements change order
Bid costs not yet determined; project will be publicly advertised for bids.
Madison Street closure
Division Road improvements for Pratt truck traffic
RDC commitment capped at $2 million; unused funds revert to Pratt, and costs above that will be negotiated with the county.
Froberg Road closures for sidewalk project
$364,500 in grant funds for the pathway.
US 30 & Silhavy Roundabout Cost Increase
Adds $76,255.76 to the roundabout contract.
Decisions during term (0)
Recorded while Hunt was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.
Voting record (0)(Roads)
No votes found matching Roads.