MediumRoads

Jessee-Pifer neighborhood sidewalks and 2026 sidewalk program

Two big sidewalk packages went out for bid: about 18,000 square feet of replacements (estimate $400,000) and new pathways along Froberg Road and 500 North (estimate $617,000). Concrete bids came in competitive; awards will be recommended at the next meeting.

5 mentions (1 this month)Last discussed Nov 13, 2026
MediumRoads

Multi-use trail expansion (TOD to downtown; Silhavy at CN tracks)

A new 1,400-foot trail will connect downtown to the Transit Oriented District, funded mostly by federal highway money ($4 million total). Construction could start next spring after tree clearing in the winter.

5 mentions (1 this month)Last discussed Nov 13, 2026
HighRoads

2027-1 Community Crossings and paving

Two bids came in for the state-funded Community Crossings road work, both above the $2.65 million estimate. The board holds off on awarding until engineers review them and return a recommendation.

11 mentions (1 this month)Last discussed Nov 13, 2026
LowRoads

Mound Street closure

A Mound Street closure involving Egolf Coates Excavating was scheduled for action. Closures can affect local traffic access during construction.

1 mention (1 this month)Last discussed Nov 13, 2026
LowRoads

Snow removal contract for LHG

A snow removal proposal for LHG was on the agenda, covering winter maintenance costs at that site.

1 mention (1 this month)Last discussed Nov 12, 2026
MediumRoads

Stormwater, water main, and street improvement projects

Big sewer separation and water main work coming to Franklin Street, plus a lead service line replacement project backed by $2.5 million in grant and $2.5 million in 0% loan money.

2 mentions (1 this month)Last discussed Oct 26, 2026
LowRoads

Joliet Road Closure

NIPSCO will close Joliet Road at Skyline Drive for about two days starting November 2 to repair a gas main leak; detours are planned and city facilities stay accessible.

2 mentions (1 this month)Last discussed Oct 23, 2026
MediumRoads

2027 Asphalt Rejuvenation Program

Twelve recently paved local streets will get a rejuvenator treatment meant to stretch pavement life by 5 to 7 years, at a cost of $106,311.

1 mention (1 this month)Last discussed Oct 23, 2026
HighRoads

G&L Superload Hauls Through City Streets

Five transformer hauls weighing about 770,000 pounds gross will roll through town starting November 14, every other day through the 22nd. The Board conditioned approval on extra engineering review and bonding to protect roads and water/sewer lines.

1 mention (1 this month)Last discussed Oct 23, 2026
HighRoads

Lincolnway–Campbell Roundabout Right-of-Way

The city is using condemnation to finish acquiring land for a roundabout at one of its crash-prone intersections — 31 crashes, six with injuries, in five years. Construction is planned for 2028.