Calkin Restoration exterior work, 101 West Spring Street
Description
Sidewalk closures approved for a 15-day, fifth-floor exterior project using an 85-foot boom lift on protective matting.
Impact summary
Pedestrians will be detoured around closed sidewalks for about two weeks, but a covered walkway keeps foot traffic protected on the Spring Street side.