Top issues during term (12)(Roads)
Wabash Road and Paw Pike resurfacing
Up to roughly $1.3 million in resurfacing work funded largely through the state Community Crossings grant.
Woodland Place road status
Roughly $3,000 difference in striping cost and possible product-quality discrepancy questioned.
Wabash Road bridge and paving project
$1,099,741 for resurfacing (mostly grant-funded) plus $711,764 for the culvert from local funds.
Bridge 46 state call application
County share would be roughly 20% of a ~$1 million project.
State Road 18 bridge closure and detour
No direct county cost — the state will fully reimburse any road damage.
Chip and seal conversions in Perry Township
Bridge program expansion
Significant federal aid and CCMG funds are flowing into bridge repairs.
County road damage and drainage from heavy truck traffic
The county has already spent money on patching the damaged road.
Gravel pit truck wash promise
Wabash Road culvert replacement after lost grant
Roughly $741,000 out of county funds instead of an $800K–$1M grant match — other road projects lose out.
2026 road maintenance materials
Annual road material costs locked in for 2026; specific total not stated.
Bridge 1605 replacement on 300 West