5 issues in water utilities with medium priority
Francis #9 crossing at SR 3 and INDOT cost-sharing
INDOT wants to pay only $37,000 of the $160,000 crossing project while the county says the state's true share is the bigger number. If talks fail by November, the county will pursue a public hearing and assess INDOT its share.
Sewer Tap-In Fee Costs and Housing Affordability
A resident pointed out the regional sewer district charges up to $7,400 plus a roughly $20,000 grinder pump to connect a new home, while the Town of LaGrange charges just $250. He urged local officials to press the sewer district to lower tap-in fees. Members noted the county has no authority over the district's rates, and compared the costs to septic systems running $12,000-$30,000.
Lakeside Park storm drain failure
A 1952 clay tile drain that handles runoff for about a dozen Lakeside Park properties failed, flooding a well head and yards. The county will spend up to $6,000 to install a new drain along the Steuben County right-of-way, with Steuben County and landowners covering the rest.
Stormwater drainage at northern Indiana lakes
Drainage came up in three of five cases — roof runoff toward neighbors, driveway water near the floodplain, and required stormwater plans. Builders are being pushed to tile water to the lakes rather than across roads.
Commercial well and septic separation rules for farm operations
The Omer Miller bottle calf barn exposed a recurring wrinkle: a house well with a 50-foot radius can't just double as a commercial well, which needs 100 feet of separation from a septic system. Owners of farm sites need to plan well placement early.