Civic Issues
Topics getting the most attention in LaGrange County public meetings, ranked by how frequently they are discussed.
10 issues in public safety
ARK Animal Shelter Purchase
County purchase approval for the ARK Animal Shelter was on the agenda, affecting county animal control services.
JDAI Coordinator Contract Termination
The Board was scheduled to consider terminating the JDAI Coordinator contract, which affects juvenile detention alternatives programming in the county.
Triplex fire-safety condition
The US 20 triplex approval came with a hard condition: a county building department inspection, including fire-encapsulating the garage beneath an upstairs apartment. Residents in the building get a safety check; the owner gets legal lending status.
Jail security — exterior detention door replacements
Two exterior jail doors are beyond repair, including one with a frame warped by foundation swelling; the sheriff is replacing them with commissary funds before winter.
EMA salary reimbursement grant
Emergency Management Director Bill Morr says he's the only one-person EMA department in northern Indiana and wants a part-time deputy — ideally when the department moves to the highway building — noting recent tornado response showed where an extra hand would help.
Livestock ordinance enforcement
Troyer built his pasture fence and put animals on the ditch without ever submitting the plans the board requested in May. The county attorney is sending him a letter; degraded ditch banks could mean costlier maintenance.
Health department funding uncertainty
The Health Department was scheduled to ask the Board for permission to apply for a grant. Grant funding could support local public health services at no cost to county taxpayers if awarded.
Pallet recycling site fire safety
A year after a semi-trailer fire, the Topeka fire chief told the commission the B&T Pallet site still doesn't meet fire code — pallets stored too close and too high, no 25-foot fire access drive, and trucks couldn't even reach the last fire. The plan is postponed until it's fixed.
Propane tank storage safety and screening
The Wingard propane business plan raised questions about fencing off flammable tank storage, screening requirements, and whether any legal setback from a river applies to propane (it doesn't, since propane doesn't leach). Chain-link protection and bunker-block spacing will be shown on the plans.
Multi-Hazard Mitigation Plan renewal
The county adopted its updated five-year hazard mitigation plan — a paperwork requirement, but without it the county would lose access to FEMA hazard mitigation grants.