Civic Issues
Topics getting the most attention in Kokomo public meetings, ranked by how frequently they are discussed.
11 issues in roads
Traffic camera expansion at city intersections
Four new MyoVision Smart View 360 traffic detection cameras will be installed at intersections around Kokomo for about $104,000. These cameras handle traffic detection rather than enforcement citations.
Cooper Street reconstruction progress payments
Citywide street milling and resurfacing with ADA curb ramp upgrades is moving to bid April 22, and Cooper Street gets a full rebuild with new curbs, sidewalks, storm sewer and ADA ramps.
Elizabeth Street construction project
Construction continues on Elizabeth Street, with a $120,419.69 payment approved for work completed January 21 through April 6.
2026 Local Street Resurfacing
The city is lining up contractors to resurface streets through the Community Crossings program and repave Cooper Street. Bids are in but not yet awarded, so actual construction awards come later.
Stadium parking lot construction
The stadium parking lot North project wrapped up with an $82,811 final payment and retainage release to EMB Paving. A contract modification had added $82,811 to the original $176,986 contract.
Mulberry Street sidewalks
The city's sidewalk project drew only one bid, at $178,840, which the board took under advisement. A construction award is still pending.
Goyer Road reconstruction — AT&T line relocation
Ahead of rebuilding Goyer Road, the city will reimburse AT&T up to $270,662.62 to move its communication lines.
Sycamore/Toby Pike intersection safety
Neighbors say cars come over a hill at high speed and a large utility pole blocks visibility when drivers pull out or turn from Toby Pike, and there have been recent accidents. City staff countered that speed studies don't substantiate the claims and traffic counts don't warrant a four-way stop. The concern didn't stop approval of the nearby 90-unit apartment project.
Gordon Road reconstruction
The city hired American Structure Point for construction engineering on the Gordon Road project, fully city-funded because the MPO has no money for this portion.
2026 Street Crack Sealing
Roughly 158,000 square yards of city streets get a protective sealant to extend pavement life, with work delayed from 2025 by heavy rain.
Speed Limit Changes Including Dixon Road
The speed limit on Dixon Road from south of Mill Street to Center Road drops from 50 to 45 mph, reflecting how traffic patterns and development have changed since the 2003 ordinance. Neighbors along the route supported the change.