CM

Chad Malicoat

County Council Member, At LargeJanuary 2025 – December 2028 (month-level start: January 2025 per Henry County 2024 General Election Candidates PDF (henrycounty.in.gov DocumentCenter/View/784) listing Dellinger and Huhn for commissioner and Davis, Koontz and Malicoat for at-large council on the November 5 2024 ballot, terms beginning the following January; month-level end: December 2028 per December 2028 per the same page; Indiana Code statute text unavailable)

No biography on file yet.

At a glance

News mentions
0

Term ending Dec 1, 2028.

Voice

Meetings spoken in
7
Total speaking time
2:50:15
Avg per meeting
24:19
Segments
2842

Want every word Malicoat has said?

The OpenCity MCP for Claude.ai answers questions like “what has Malicoat said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (13)(Roads)

critical↓Jun 2026[22]

Bridge 178 Replacement Grant

Estimated $1,154,000 project with the state covering roughly 53%.

low↑Oct 2026[10]

Louisville pothole equipment request

The town would likely reimburse the county for patch mix at cost.

medium↓Oct 2026[5]

Highway staffing levels and possible LTAP department study

Leaving the four open positions unfilled saves roughly $214,000, but tightening crews means no slack for illness, vacations or storms.

medium↓Aug 2026[5]

One-Way Traffic and Parking Along the Big Pond

Striping, bollards, and bridge lights would be paid from the existing lighting fund; broader paving is uncertain.

medium↓May 2026[2]

Highway dump truck fleet replacement

About $253,555 for two trucks before the stainless bed upfit, with payment deferred to next year's budget.

medium↓Jul 2026[2]

Park roads and pothole repair funding

About $3,200 of ARP funds remain, and the county highway department sells patching material to the park at cost.

medium↓May 2026[2]

400 South bridge project

medium↓May 2026[1]

Federal transit funding for Live Streams

No direct county cost — the resolution enables federal grant reimbursements for transit operations.

high↓Jan 2026[1]

400 South bridge reopening and engineering funding

$800,000 from the general fund max levy increase headed into a dedicated rainy day fund line, with about $10 million in total repairs needed.

high↓Jan 2026[1]

Messick Road condition and traffic capacity

No current budget exists for reconstruction; the solar-farm truck traffic south of Dunreith was cited as an example of heavy vehicles destroying a road.

medium↓Feb 2026[1]

Bridge 115 epoxy injection repairs

high↓Mar 2026[1]

Safe Streets for All $50,000 Invoice

The resolution itself costs nothing, but a $50,000 cost-share invoice for the underlying planning grant is unresolved.

medium↓Jan 2026[1]

2026 highway supply bids

Bid awards set supplier pricing for county road work in 2026; specific totals were not stated.

Decisions during term (3)

Recorded while Malicoat was in office — not necessarily decisions they moved, spoke to, or voted on.

Voting record (0)(Roads)

No votes found matching Roads.