303 Chandler Ave. repair order
Summary not yet generated for this topic.
Community sentiment
At a glance
- Public comments
- 5
- Last 30 days
- 0
Discussed at 1 meeting in the last 60 days; most recently Sep 24, 2026.
Public comments (5)
The Riverside Neighborhood Association president said neighbors are 'aghast' at the collapsing brickwork, reported a productive meeting with Mayor Terry and the building commissioner, and asked for maximum fines given no progress since April.
Hearing Authority - Sep 24, 2026 · 15:33 →Forrest described two stop-work orders being ignored during 2024 brick work that concealed structural problems, and asked that professional engineering be required to determine why the 25-foot wall is failing.
Hearing Authority - Sep 24, 2026 · 17:05 →Living across the street for ten years, she described cheap renovations, tenants without heat asking her for space heaters, a loose balcony, and police run records, and asked for maximum fines.
Hearing Authority - Sep 24, 2026 · 21:23 →A local pastor, he testified he witnessed the wall collapse in chunks, called the balcony a deadly hazard for children, and said the property is unsafe for the community.
Hearing Authority - Sep 24, 2026 · 22:00 →The property manager said he understands the needed work, noting a licensed contractor pulled a repair permit on September 22.
Hearing Authority - Sep 24, 2026 · 6:40 →