CenterPoint road closure on CR 600 West
CenterPoint briefly closed 600 W without permits last week; after a rebuke, it filed properly. Commissioners approved a two-week closure (Nov 4–18, weekdays 8–4:30) to replace rotting transmission poles, with detours and final engineer review required.
Speed limits on Old Road 64 and county roads
Resident Jim Meyer raised concerns about rapidly shifting speed limits on Old 64, especially with school buses on the route. The Highway Department will drive the road and review it; the engineer explained posted limits require engineering studies and usually only change after study.
Hillham Road South closure
Heads up: Hillham Road South closes for four to five weeks starting October 26 for a culvert replacement, and the nearby railroad tunnel is too narrow for detouring large trucks.
900 E road requests and SR 56 intersection safety
A Columbia Township resident wants 35 mph signs, chip seal, and a flashing warning light at 900 E and SR 56, partly to enable a subdivision. The engineer says speed signs don't slow drivers on gravel roads, the chip seal policy requires right-of-way the county can't find, and the SR 56 sight-distance issue rests with INDOT.
900 East chip seal petition and right-of-way policy
Eleven of twelve landowners along CR 760 E signed the right-of-way petition, but one holdout is blocking the road from making the chip seal list. The county won't bend its 2019 sixty-foot right-of-way policy and will try again to talk to the landowner.
Schnellville Conservation Club embankment slide near 175 S
A significant slide between the club's lake and Road 175 S is within a couple feet of the roadway. The club will fix its failing wall first, and the county will coordinate its repair — with possible road closure if the slide shifts.
Gibson County highway interlocal agreement
The two counties could share highway equipment, materials, and even staff on request. It's on hold pending an insurance review and concerns about liability for employees working across county lines.
In-house bridge crew pay and retention
Dubois County's bridge crew is the only one in Indiana that designs and builds bridges in-house, saving the county big money. Members are leaving for better pay, so council agreed to bump wages about $2/hour.
US 231 funding accountability from INDOT
A Jasper resident warned that if the corridor is built, Jasper, Huntingburg and the county would inherit US 231 upkeep they can't afford, possibly raising taxes.
Guardrail Safety Grant appropriation
The county won a $3.7 million federal grant to upgrade guardrails; it only pays 10% and must front the money, so council approved $550,000 to keep the multi-year project moving.
Community Crossings paving and highway technology
The highway department wants an AI system that photographs roads every 10 feet, rates pavement, tracks signs and work orders — $32,200 a year out of the highway fund. Decision pending contract review.
Bretzville Junction roundabout construction
INDOT awarded the SR 64/162 roundabout contract to Ragle; construction starts this summer with both lanes kept open in all directions and completion expected by year-end.
Gas tax suspension threatens road funding
The suspension of Indiana's gas tax could leave the highway department short, delaying the CR 650 S gravel-to-chip-seal project and possibly requiring extra help from the County Council.
Solar Project Road Damage on County Road 750S
Solar construction traffic is roughing up 800 South and kicking up dust. Commissioners say the road will be damaged during the project but must be restored to existing condition or better afterward, and they're exploring posting speed limit signs.
Shamrock Mine Road bonds reclamation
DNR offered two paths on the coal mine road bonds: let the surety do the road repairs (with a two-year warranty) or take the bonds and fix roads county-side. No action yet — leaning toward option 1.
2026 County Road Paving Program
A 19-year-old subdivision with chip-seal roads wants asphalt. All 34 homeowners signed a petition, but the county's road-rating system puts them years away — 2028 at the earliest — unless residents pay for materials.
15th Street Bridge project shelved
Jasper deprioritized the 15th Street bridge extension and terminated the interlocal agreement, so the county reclaimed $1.15 million for other bridge maintenance.
760 E right-of-way holdout
One of twelve landowners still won't sign over right-of-way for the 760 East road upgrade, blocking the narrowest stretch. The highway department will visit in person to try to work it out.
Bridge closures this spring
Bridge 78 is closed until early-to-mid June, St. Anthony Road bridges 107 and 240 close around May 7 for 4-5 weeks, and Bridge 119 on Club Road reopens this week.
15th Street interlocal agreement termination
Jasper shelved the 15th Street extension and bridge, so the county formally pulled out of the 2023 deal — freeing up money it had pledged for the bridge.
Bridge 116 closure and county highway projects
The Patoka River bridge will close for about 60 days starting late spring for a deck overlay and end-bent work, with no good detour. Residents who use Division Road should plan alternate routes this summer.
Mid-States Corridor RDA membership
Dubois County's eight-year membership in the RDA expires May 10, 2026, and the county must decide whether to continue. The RDA coordinated the Tier 1 study and advocates for the corridor project; withdrawing wouldn't stop the road, but supporters say the county loses a low-cost advocate.
US 231 relinquishment and RDA participation
If the corridor is built, the county may be asked to take over maintenance of old US 231. Residents questioned whether those costs were included in the Tier 1 study and who negotiates the terms.
2026 Paving Plan
Roughly $1.1 million in hot mix on 12 roads and $228,870 in rejuvenation on 11 more, with the final schedule due in April.
Bridge 78 and St. Anthony bridges closures
Bridge 78 on Division Road will close roughly 60 days for rehab, and Bridges 107 and 240 on St. Anthony Road will close simultaneously this spring for 30-35 days each. Plan your routes.
Mid-States Corridor watch
The board discussed the controversial Mid-States Corridor project and the RDA after a long county council meeting; commissioners meet with INDOT March 3 to stay informed.
St. Anthony Road N closure for culvert
The road is closed this week for a precast box culvert replacement, reopening around Friday, January 9.
Bridge safety improvement grant
The county is interviewing with INDOT for a federal grant worth up to $3.789 million to add guardrails and crash-worthy end treatments to 50-60 county bridges.