CenterPoint road closure on CR 600 West

CenterPoint briefly closed 600 W without permits last week; after a rebuke, it filed properly. Commissioners approved a two-week closure (Nov 4–18, weekdays 8–4:30) to replace rotting transmission poles, with detours and final engineer review required.

2 mentions (1 this month)Last discussed Nov 2, 2026
MediumRoads

Speed limits on Old Road 64 and county roads

Resident Jim Meyer raised concerns about rapidly shifting speed limits on Old 64, especially with school buses on the route. The Highway Department will drive the road and review it; the engineer explained posted limits require engineering studies and usually only change after study.

1 mention (1 this month)Last discussed Nov 2, 2026
MediumRoads

Hillham Road South closure

Heads up: Hillham Road South closes for four to five weeks starting October 26 for a culvert replacement, and the nearby railroad tunnel is too narrow for detouring large trucks.

2 mentions (1 this month)Last discussed Oct 19, 2026
MediumRoads

900 E road requests and SR 56 intersection safety

A Columbia Township resident wants 35 mph signs, chip seal, and a flashing warning light at 900 E and SR 56, partly to enable a subdivision. The engineer says speed signs don't slow drivers on gravel roads, the chip seal policy requires right-of-way the county can't find, and the SR 56 sight-distance issue rests with INDOT.

2 mentions (2 this month)Last discussed Oct 19, 2026
MediumRoads

900 East chip seal petition and right-of-way policy

Eleven of twelve landowners along CR 760 E signed the right-of-way petition, but one holdout is blocking the road from making the chip seal list. The county won't bend its 2019 sixty-foot right-of-way policy and will try again to talk to the landowner.

5 mentionsLast discussed Oct 5, 2026
MediumRoads

Schnellville Conservation Club embankment slide near 175 S

A significant slide between the club's lake and Road 175 S is within a couple feet of the roadway. The club will fix its failing wall first, and the county will coordinate its repair — with possible road closure if the slide shifts.

1 mentionLast discussed Sep 8, 2026
LowRoads

Gibson County highway interlocal agreement

The two counties could share highway equipment, materials, and even staff on request. It's on hold pending an insurance review and concerns about liability for employees working across county lines.

1 mentionLast discussed Sep 8, 2026
HighRoads

In-house bridge crew pay and retention

Dubois County's bridge crew is the only one in Indiana that designs and builds bridges in-house, saving the county big money. Members are leaving for better pay, so council agreed to bump wages about $2/hour.

1 mentionLast discussed Aug 31, 2026
HighRoads

US 231 funding accountability from INDOT

A Jasper resident warned that if the corridor is built, Jasper, Huntingburg and the county would inherit US 231 upkeep they can't afford, possibly raising taxes.

8 mentionsLast discussed Aug 31, 2026
MediumRoads

Guardrail Safety Grant appropriation

The county won a $3.7 million federal grant to upgrade guardrails; it only pays 10% and must front the money, so council approved $550,000 to keep the multi-year project moving.

1 mentionLast discussed Aug 31, 2026
HighRoads

Community Crossings paving and highway technology

The highway department wants an AI system that photographs roads every 10 feet, rates pavement, tracks signs and work orders — $32,200 a year out of the highway fund. Decision pending contract review.

8 mentionsLast discussed Aug 17, 2026
MediumRoads

Bretzville Junction roundabout construction

INDOT awarded the SR 64/162 roundabout contract to Ragle; construction starts this summer with both lanes kept open in all directions and completion expected by year-end.

2 mentionsLast discussed Jul 6, 2026
HighRoads

Gas tax suspension threatens road funding

The suspension of Indiana's gas tax could leave the highway department short, delaying the CR 650 S gravel-to-chip-seal project and possibly requiring extra help from the County Council.

3 mentionsLast discussed Jul 6, 2026
HighRoads

Solar Project Road Damage on County Road 750S

Solar construction traffic is roughing up 800 South and kicking up dust. Commissioners say the road will be damaged during the project but must be restored to existing condition or better afterward, and they're exploring posting speed limit signs.

3 mentionsLast discussed Jun 15, 2026
MediumRoads

Shamrock Mine Road bonds reclamation

DNR offered two paths on the coal mine road bonds: let the surety do the road repairs (with a two-year warranty) or take the bonds and fix roads county-side. No action yet — leaning toward option 1.

1 mentionLast discussed May 18, 2026
HighRoads

2026 County Road Paving Program

A 19-year-old subdivision with chip-seal roads wants asphalt. All 34 homeowners signed a petition, but the county's road-rating system puts them years away — 2028 at the earliest — unless residents pay for materials.

2 mentionsLast discussed May 4, 2026
MediumRoads

15th Street Bridge project shelved

Jasper deprioritized the 15th Street bridge extension and terminated the interlocal agreement, so the county reclaimed $1.15 million for other bridge maintenance.

1 mentionLast discussed Apr 27, 2026
MediumRoads

760 E right-of-way holdout

One of twelve landowners still won't sign over right-of-way for the 760 East road upgrade, blocking the narrowest stretch. The highway department will visit in person to try to work it out.

1 mentionLast discussed Apr 20, 2026
HighRoads

Bridge closures this spring

Bridge 78 is closed until early-to-mid June, St. Anthony Road bridges 107 and 240 close around May 7 for 4-5 weeks, and Bridge 119 on Club Road reopens this week.

1 mentionLast discussed Apr 20, 2026
LowRoads

15th Street interlocal agreement termination

Jasper shelved the 15th Street extension and bridge, so the county formally pulled out of the 2023 deal — freeing up money it had pledged for the bridge.

1 mentionLast discussed Apr 6, 2026
HighRoads

Bridge 116 closure and county highway projects

The Patoka River bridge will close for about 60 days starting late spring for a deck overlay and end-bent work, with no good detour. Residents who use Division Road should plan alternate routes this summer.

4 mentionsLast discussed Apr 6, 2026
HighRoads

Mid-States Corridor RDA membership

Dubois County's eight-year membership in the RDA expires May 10, 2026, and the county must decide whether to continue. The RDA coordinated the Tier 1 study and advocates for the corridor project; withdrawing wouldn't stop the road, but supporters say the county loses a low-cost advocate.

2 mentionsLast discussed Mar 20, 2026
HighRoads

US 231 relinquishment and RDA participation

If the corridor is built, the county may be asked to take over maintenance of old US 231. Residents questioned whether those costs were included in the Tier 1 study and who negotiates the terms.

3 mentionsLast discussed Mar 20, 2026
MediumRoads

2026 Paving Plan

Roughly $1.1 million in hot mix on 12 roads and $228,870 in rejuvenation on 11 more, with the final schedule due in April.

1 mentionLast discussed Mar 16, 2026
HighRoads

Bridge 78 and St. Anthony bridges closures

Bridge 78 on Division Road will close roughly 60 days for rehab, and Bridges 107 and 240 on St. Anthony Road will close simultaneously this spring for 30-35 days each. Plan your routes.

1 mentionLast discussed Mar 2, 2026
MediumRoads

Mid-States Corridor watch

The board discussed the controversial Mid-States Corridor project and the RDA after a long county council meeting; commissioners meet with INDOT March 3 to stay informed.

2 mentionsLast discussed Mar 2, 2026
LowRoads

St. Anthony Road N closure for culvert

The road is closed this week for a precast box culvert replacement, reopening around Friday, January 9.

1 mentionLast discussed Jan 5, 2026
MediumRoads

Bridge safety improvement grant

The county is interviewing with INDOT for a federal grant worth up to $3.789 million to add guardrails and crash-worthy end treatments to 50-60 county bridges.