Civic Issues
Topics getting the most attention in Daviess County public meetings, ranked by how frequently they are discussed.
29 issues with high priority
Measles outbreak response
The county health department is dealing with a regional measles outbreak, taking thousands of calls and offering walk-in vaccinations and a special clinic in Washington.
JRC Integrated Systems expansion
JRC's new $22 million, 66,000-square-foot office at WestGate grows the company from 7 to 50 high-wage employees and hosts 200 Department of War workers.
J. Wagler Family Properties tax abatement
A new industrial building near Elnora would get a 10-year real property abatement at 10% a year and a 5-year personal property abatement at 20%. The county forgoes some tax revenue but hopes to gain jobs and investment.
West Boggs Park improvement grant and $200,000 county match
Restrooms dating to 1972 serve nearly half a million annual visitors and are failing. A 50/50 federal grant plus a $355,000 park match, a $200,000 community foundation request, and a possible $100,000 RDC match could fund new bathrooms, an office, a campground loop, and pickleball courts.
Kratos Helios arc-jet facility
Kratos' Helios project is a one-of-a-kind 20-30 megawatt arc-jet and laser testing facility — about $105 million invested and 25 new jobs — with groundbreaking planned for spring.
Strongbox TIF bond for WestGate infrastructure
The EDC reports the Navy is praising Westgate at Crane Tech Park, another Crane-related business is looking for local property, Japanese companies may invest in Indiana, and a downtown opportunity zone designation is headed to the U.S. Treasury.
Kemp Cabinet hazardous material at county landfill
A cabinet company brought hazardous material to the county landfill for about three years before IDEM caught it roughly a year ago. The county signed a state agreed order making clear it didn't know — but extra water sampling is now required, and the county is tracking those costs.
Security Center plumbing emergency
The jail's plumbing has leaked since it was built and the 25-year-old boiler has cost $36,000 this year alone. The $1.13 million BOT fix was tabled while commissioners verify the procurement steps and compare options — but every month of delay costs the county more in emergency repairs.
YMCA project funded through TIF
The 80-year-old YMCA needs replacing, and the project's cost has grown to roughly $32 million. Commissioners approved a $4 million letter of intent plus a contingent $1 million; the city is contributing $3 million and a private campaign has raised $2.3 million toward its $5 million goal.
Jury trial costs straining the courts budget
Felony trials — including a murder case — require three interpreters at once, and the county is constitutionally required to pay for them. The $10,000 covers trials coming up soon.
Daviess Community Hospital turnaround
DCH says it's stabilizing after hard years: new women's health center, orthopedics, a specialty pharmacy, and a new Epic medical records system launching within 30 days. Oncology returns in January 2027, and leaders say keeping care local protects county residents from driving to Bloomington or Evansville.
Community Crossings road paving grant
Portersville Road was milled from 700 South to the bridge and is being paved, with more sections planned. Millings from recent projects are being reused on roads tiled last year, especially in the Amish area.
Government Center repair needs and flood damage
Heavy rains and flooding prompted EMA Director Scott Myers to ask the county to declare an emergency, which may make state recovery funds available. It's the first step if residents and the county want help paying for damage.
Vote center contracts for Conservation Club and Ruritan
The 2024 voting machines are much bigger and heavier — around 70 pounds each — so the Clerk's office now hires a moving company to get them to and from polling places. Commissioners approved continuing that arrangement this year.
911 System Replacement on the Horizon
Dispatch warned the county will likely need a new 911 system in three to five years — a Motorola quote came in around $650,000 today. The existing surplus has been drained by radio projects, and the E-911 fund is restricted to specific uses.
Gas tax suspension reimbursement and highway fund strategy
Commissioners flagged a growing gap in road funding as gas tax revenues shrink — aheads-up for future road budgets.
Tech park development on west side off SR 231
New sewer lift stations are going in, Kratos is hiring now with about 100 employees expected by September, and roughly 60% of development prospects are still in the early feasibility stage. Commissioners want concrete job counts for 2026-2028 and a rundown of prospects — expect an email by March 10.
Federal funding locked in for guardrail and bridge projects
After striking out in 2024, the county won all three grants it applied for in 2025 — a $2.7 million Bridge 95 replacement (80% federal) and guardrails on the causeways (90% federal). The catch: the county must be under contract with a consultant by August 1 or the money disappears.
School Guard 911 replaced with cheaper alert system
The county's emergency notification system is delivering garbled, sometimes wrong alerts. A replacement is in the works, but switching mid-tornado-season risks a coverage gap.
Crane West Gate water tower project
A growing Westgate tech park needs more water capacity for fire suppression, and the feds could cover 80% of a tower project via an EDA grant — leaving the county a roughly $2 million match. But the tower would be owned by Greene County's Eastern Heights Utility, and Commissioners Cook and Gabhart want to know who really controls rates and the asset before any money is committed.
Community AED program under funding pressure
The health department has placed 137 AEDs around the community over 20 years but has lost about 70% of its funding. It's switching to a pass-through model where churches and the YMCA reimburse the county for devices so the program can continue.
County Road 650 E Safety and Buggy Lanes
Montgomery Road is now the county's most accident-prone road; officials plan a separate community meeting to gauge Amish support for buggy lanes and to identify federal grant funding.
$606,000 in TIF funds for firefighter protective equipment
GPC TIF money will buy new turnout gear, air masks and extrication equipment for volunteer fire departments, mostly in the newly forming Central and Northwest fire districts. Most of these firefighters are unpaid volunteers answering calls with outdated gear.
West Boggs lake water quality and sediment basins
West Boggs Lake suffers severe algae problems driven by agricultural runoff, hurting summer recreation and property values. A $550,000 enzyme-based treatment project — with $60,000 in county money — aims to clean the water and restore late-summer visitation and fishing.
Reopening County Road 200 at the mine
REO says it'll realistically take a year and a half to reopen County Road 200 because slow sales mean less material to work with. Commissioners will get periodic updates and are still improving the runaround road.
EMS contract cost increase
Commissioners agreed to let the hospital be paid its second EMS installment early so it has cash on hand — ambulances cost around $300,000 and equipment failures can't wait on insurance payments.
Runaround Road completion delayed
The long-promised runaround road is 90-95% done but still not connected to the county road — it was due at the end of 2025. The contractor couldn't get stone on time, then the snowstorm hit. Commissioners are holding the developer's bonds until it's finished and want the contractor at the March 10 meeting to explain themselves.
Solar zoning ordinance stays strict
A county commissioner discovered the 2,500-foot solar setback he'd been describing as 'from existing homes' actually applies to property lines. After airing the mix-up, the Board confirmed the ordinance stays as written — meaning even a non-neighbor half a mile away can effectively block a solar field near their property.
Health department funding cuts
A $40,000 nurse practitioner salary line that got shuffled out during budget hearings was added back from Health First Indiana reserves.