Dawn Lowden
No biography on file yet.
Voice
- Meetings spoken in
- 3
- Total speaking time
- 0:02
- Avg per meeting
- 0:01
- Segments
- 6
Want every word Lowden has said?
The OpenCity MCP for Claude.ai answers questions like “what has Lowden said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (20)(Roads)
2027 road paving funding (CCMG partial award)
About $999,000 in state funds will offset local paving costs.
Avon Village Parkway / Eden Gate Drive Traffic Circle
The design contract cost isn't stated in the materials, and the project is locally funded by the town rather than through state or federal grants.
Future collector road connection and US 36 corridor traffic
Landscape bonds are required from each developer before occupancy certificates issue.
ADA Sidewalk Repairs in Mapleton at Wynne Farms
Up to $35,922.84 from the MVH budget.
Speed Limit Reductions on Three Roads
Minor cost for sign replacement only.
Walmart traffic and safety on Avon Avenue/Governors Row
A required roundabout at Avon Avenue and Governors Row would be built at the property owner's expense if the project moves forward.
County road transfers (CR 525 East and CR 100 South)
Saves ~$60,000 now (and potentially $250,000 via CCMG eligibility), but adds permanent maintenance cost with no new property tax revenue.
Dan Jones Road Widening Phase 5 Funding
Design costs for the next phase of the Dan Jones project will be paid from redevelopment funds.
Failing Traffic Signal at Ronald Reagan and County Road 100 N
Costs $32,000, the lowest of the quotes received.
Lane Mile Direct Distribution Fund for Road Money
About $87,000 in new dedicated road maintenance revenue.
Trail connections
Funding available from $3.3 million food and beverage fund balance and recreation impact fee reserves.
Bradford Road extension timing
The town will likely have to fund a bridge and road extension, with cost estimates not yet available.
Inherited culvert responsibilities
Unknown replacement costs, but stormwater utility funds can be used.
Driveway spacing waiver on Kingston Street
Guardrail Damage Settlement
The $8,000 repair cost is fully covered by the driver's insurer, not taxpayers.
INDOT US 36 Added Travel Lane Project
Relocation of the water line alone is expected to cost tens of millions of dollars, borne by the water company.
Beechwood Centre Road extension
The property owner bears the cost of the future driveway closure and curb restoration.
2026 road salt supply and winter readiness
About $171,000 from the Motor Vehicle Highway fund — gas tax money, not property taxes.
Dan Jones corridor construction progress
Walmart Market traffic impacts and Governors Row roundabout
Walmart—not taxpayers—pays for the road improvements, but the roundabout encroaches on fire station land and may need future apparatus spending of $5-10 million for tiller trucks.
Decisions during term (2)
Recorded while Lowden was in office — not necessarily decisions they moved, spoke to, or voted on.
Voting record (1)(Roads)
Oldest to newest — hover a bar for the item.