Civic Issues
Topics getting the most attention in Avon public meetings, ranked by how frequently they are discussed.
7 issues in roads with high priority
Avon Village Parkway / Eden Gate Drive Traffic Circle
The town wants to replace the two-way stop at Avon Village Parkway and Eden Gate Drive with a traffic circle to improve safety and traffic flow near the US 36 and Walmart corridor. The commission will consider the design contract that kicks off survey, design, and right-of-way work.
2027 road paving funding (CCMG partial award)
Avon locked in nearly $1 million in state Community Crossings money for 2026 paving, with streets chosen by asset-management software based on condition, traffic and age.
Future collector road connection and US 36 corridor traffic
Three projects on the corridor moved forward — an office building, two retail buildings, and a restaurant rehab — filling long-vacant parcels and replacing four driveway cuts with two on the retail site.
Failing Traffic Signal at Ronald Reagan and County Road 100 N
The intersection's battery-powered road sensors are dead, causing detection problems. A $32,000 LIDAR upgrade was approved and should restore safe, reliable signal operation.
Dan Jones Road Widening Phase 5 Funding
The design contract for Phase 5 of the Dan Jones project was approved, moving the road improvement project forward.
County road transfers (CR 525 East and CR 100 South)
Avon is spending $500K of Easton Grey road money on a county-owned road; taking it over avoids $60,000 in required repaving and gives the town control, though it means long-term maintenance without new tax revenue.
Trail connections
Three long-delayed trail projects — including a sidewalk connection in front of the high school — could finally be bid this year using food and beverage and impact fee funds. Bids come back to the council for a final yes or no.