Rooster Ditch cleanup delay
A resident says the lower end of Rooster Ditch hasn't been cleaned in four-plus years, backing water onto fields. The surveyor promised to move it to the top of the fall work list.
Building variances near legal drains
A Monroe farmer wanted to build a horse shelter 49 feet from an open county drain instead of the required 75 feet. The board agreed the pasture setting and existing fence make the closer building workable.
Yellow Creek landowner maintenance partnership
Local landowners (renters, actually) spent two years clearing brush and log jams along Yellow Creek, the channel that carries Monroe's floodwater. The board paid them $17,200 from the Yellow Creek maintenance fund and encouraged them to continue.
Fences along ditch banks
Fences blocking the ditch right-of-way are a recurring headache. The board can legally remove fences during projects, but a formal resolution — and possibly a commissioners' ordinance with punitive measures — is being drafted.
Courthouse sewer line repair
The women's courthouse restroom keeps clogging on old cast-iron pipe, and the county wants a cleanout installed before early voting crowds arrive.
Flea market and produce auction stormwater plan
The Monroe livestock auction is building a stormwater retention pond and needs to connect to the county legal tile. The board approved the tie-in easements; the full drainage plan still needs review.
Watershed consolidation proposal
With 126 watersheds — many just tiles feeding into bigger drains — the surveyor wants to combine them into fewer, larger systems while Christopher Burke redelineates them. Fewer funds and accounts could mean more flexibility for repairs.
Andrews/Monroe holding pond and stormwater study funding
The board committed $2,000 to complete the local cost share on a FEMA grant application that could fund the next four phases of the Andrews/Monroe stormwater study. FEMA could cover 75–90% of the $122,000 project.
Mapping the county's century-old legal tiles with GNSS
Nobody knows exactly where many of the county's legal tiles run — the records are scans of drawings up to 100 years old. New handheld GNSS receivers could let the surveyor and repair crews log exact locations and elevations at every repair, gradually building an accurate map.
Landowner tile repair program growing pains
A new master agreement lets the county hire pre-signed contractors for tile repairs under $20,000 without a fresh contract each time, speeding up winter repair work.
Holthouse/Kintz brush clearing
Landowner Don Braun and his crew cleared heavy brush and pulled log jams from the Holthouse and Kintz drains; the board will reimburse the full $12,206 project cost.